DELHI
ELECTRICITY REGULATORY COMMISSION (SUPPLY CODE AND PERFORMANCE STANDARDS)
REGULATIONS, 2017
PREAMBLE
In exercise of the powers conferred by
Section 46, 50 read with Section 57, Section 181 of the Electricity Act, 2003
(Act 36 of 2003) and all other powers enabling it in this behalf and after
previous publication, the Delhi Electricity Regulatory Commission hereby makes
the following Regulations, namely Delhi Electricity Regulatory Commission
(Supply Code and Performance Standards) Regulations, 2017.
CHAPTER-I
GENERAL
Regulation - 1. Short title, extent and commencement:
(1)
These
Regulations may be called "Delhi Electricity Regulatory Commission (Supply
Code and Performance Standards) Regulations, 2017".
(2)
These
Regulations shall be applicable to all the Distribution Licensees including
Deemed Licensees and all consumers in the National Capital Territory of Delhi.
(3)
These
Regulations shall come into force from 1.9.2017.
Regulation - 2. Definitions:
In these Regulations, unless the context
otherwise requires:-
(1)
"Act"
means the Electricity Act, 2003, as amended from time to time;
(2)
"Accredited
laboratory" means a laboratory accredited by National Accreditation Board
for Testing and Calibration Laboratories (NABL);
(3)
"Agreement"
means an agreement, with its grammatical variations and cognate expressions,
entered into by a Licensee and/or its predecessors and its consumer including
any commercial arrangement for supply of electricity;
(4)
"Apparatus"
means electrical apparatus; and includes all machines, fittings, accessories
and appliances connected to the Electrical Distribution System;
(5)
"Appellate
Authority" means the authority prescribed by Government of National
Capital Territory of Delhi under sub-section (1) of Section 127 of the Act;
(6)
"Applicant"
means an owner or occupier of any premises who files an application with a
Licensee, in accordance with the provisions of the Act, the rules, the
regulations and the Order made there under, for purposes such as:
(i)
supply
of electricity including temporary connection;
(ii)
increase
or reduction in sanctioned load or contract demand;
(iii)
change
of category;
(iv)
issues
related to billing or change of particulars related to connection;
(v)
disconnection
or reconnection of supply;
(vi)
termination
of agreement or for other services, etc.
(7)
"Application"
means an application complete in all respects in the appropriate format along
with all requisite documents;
(8)
"Area
of Supply" means the geographic area within which Licensee is, for the
time being, authorized by his license to supply electrical energy;
(9)
"Assessing
Officer" means an officer of a State Government or Board or Licensee, as
the case may be, designated as such by Government of National Capital Territory
of Delhi, under Section 126 of the Act;
(10)
"Authorized
Officer" means an officer of the Licensee or supplier, as the case may be,
designated as Authorized Officer by the Government of National Capital
Territory of Delhi under sub-section (2) of Section 135 of the Act;
(11)
"Authority"
means the Central Electricity Authority (CEA) as referred to in sub-section (1)
of Section 70 of the Act;
(12)
"Average
Power Factor" means the ratio of kWh (kilo Watt Hour) to the kVAh (kilo
Volt Ampere Hour) registered during a specific period;
(13)
"Bank
rate" means the base rate or Marginal Cost of Fund based Lending Rate
(MCLR) or any other benchmark rate as notified by the State Bank of India;
(14)
"Bill
date" means the date on which the bill is prepared by the distribution
Licensee;
(15)
"Billing
cycle" or "Billing period" means the period as approved by the
Commission for which regular electricity bills are to be prepared by the
Licensee for different categories of consumers;
(16)
"Billing
demand" means highest of the following:-
(i)
the
contract demand or the sanctioned demand wherever contract demand has not been
provided in the supply agreement.
(ii)
the
maximum demand indicated by the meter during the billing cycle.
(17)
"Calendar
year" means the period from the first day of January of a Gregorian
calendar year to the thirty first day of December, of the same year;
(18)
"CEA
(Measures Relating to Safety and Electric Supply) Regulations, 2010" means
the CEA (Measures Relating to Safety and Electric Supply) Regulations, 2010 as
amended from time to time and Indian Electricity Rules, 1956 to the extent
saved by the Act or any other relevant Regulations/Rules made there under;
(19)
"Commission"
means the Delhi Electricity Regulatory Commission as referred to in sub-section
(1) of Section 82 of the Act;
(20)
"Consumer"
means any person defined as such in the Act;
(21)
"Contract
demand" means the demand in kW or kVA (kilo watt or kilo Volt Ampere) as
provided in the agreement, which shall not be less than 60% of the sanctioned
load and for which the Licensee makes specific commitment to supply subject to
the governing terms and conditions;
(22)
"Correct
Meter" means a meter, which shall at least have features, accuracy class,
standards and specifications as per CEA (Installation and Operation of Meters)
Regulations, 2006 as amended from time to time;
(23)
"Day(s)"
for any period specified by day(s) means as working days, unless notified
otherwise;
(24)
"Developer"
means any person who undertakes development of an area (including
electrification on their own or through a Licensee) including public land
development agencies (like Delhi Development Authority, Municipal
Corporation(s) of Delhi, New Delhi Municipal Council, Delhi State Industrial
& Infrastructure Development Corporation Ltd., Delhi Urban Shelter
Improvement Board, WAKF Board etc.), private developer, private colonizers,
builders, Cooperative Group Housing societies, group housing societies,
co-operatives, associations etc., within the area of supply of the distribution
Licensee including any residential-cum-commercial complex approved by an
appropriate authority;
(25)
"Distributing
Main" refers to the portion of any main with which a service line is or is
intended to be immediately connected;
(26)
"Distribution
System" means the system of wires and associated facilities used for
distribution/supply of electricity between the delivery points on the
transmission lines or the generating station connection and the point of
supply;
(27)
"Electrical
Inspector" means a person appointed as such by the Government of National
Capital Territory of Delhi under sub-section (1) of Section 162 of the Act and
also includes the Chief Electrical Inspector;
(28)
"Energy
charges" means the charges levied as per the provisions of the Tariff
Order issued by the Commission from time to time for energy consumed by the
consumer in kWh or kVAh (kilo Watt Hour or kilo Volt Ampere Hour), as the case
may be, in any billing cycle or billing period;
(29)
"Electrified
Area" means all areas other than those specified as unelectrified areas;
(30)
"Financial
year" means the period beginning from the first day of April in a
Gregorian calendar year and ending with the thirty first day of March of the
next year;
(31)
"Fixed
Charges" for a billing cycle or billing period means the charge levied as
per the provisions of the Tariff Order issued by the Commission from time to
time;
(32)
"Force
Majeure" means the occurrence of any event/circumstances which are beyond
the control of a Licensee which could not have been reasonably foreseen by the
Licensee and which has the effect of preventing/delaying due performance of any
obligation by the Licensee;
(33)
"Forum"
means the Consumer Grievance Redressal Forum (CGRF) established under
sub-section (5) of Section 42 of the Act;
(34)
"Franchisee"
means a person authorized by a distribution Licensee to distribute electricity
on its behalf in a particular area within his area of supply;
(35)
"Harmonics"
means a component of a periodic wave having frequency that is an integral
multiple of the fundamental power line frequency of 50 Hz, causing distortion
to pure sinusoidal waveform of voltage or current;
(36)
"IEEE
Standard" relates to the technical standards issued from time to time by
the Institute of Electrical and Electronics Engineers (IEEE), United States of
America;
(37)
"Late
Payment Surcharge (LPSC)" means the monetary charge levied as per
provisions of the Tariff Orders, on a consumer, for the period of delay in payment
of its bills beyond due date;
(38)
"Licensed
Electrical Contractor (LEC)" means a contractor licensed by the Government
of National Capital Territory of Delhi in accordance with the provisions of
Central Electricity Authority (Measures relating to Safety and Electric Supply)
Regulations, 2010 as amended from time to time;
(39)
"Licensee"
or "Distribution Licensee" means a person who has been granted a
license under Section 14 of the Act to operate and maintain a distribution
system for supplying electricity to the consumers in his area of supply and
includes a deemed Licensee;
(40)
"Maximum
Demand (MD)" means the highest average load measured in kVA or kW at the
point of supply of a consumer during a consecutive period of thirty minutes or
such other consecutive period as may be notified by the Commission during a
billing cycle;
(41)
"Meter"
means a correct meter suitable for measuring, indicating and recording
consumption of electricity, maximum demand, any other parameter or any other
information related with electrical system, as may be specified by the
Authority or notified by the Commission and shall include, wherever applicable,
other equipment such as Current Transformer (CT), Voltage Transformer (VT) or
Capacitor Voltage Transformer (CVT) necessary for such purpose and shall
include net meter;
Explanation:- It shall also include any seal
or sealing arrangement and other measures/attributes provided by the Licensee
for securing reliability and for preventing theft/unauthorised use of
electricity.
(42)
"Net
meter" means an appropriate meter capable of recording both import &
export of electricity or a pair of meters one each for recording the net import
and net export of electricity as the case may be;
(43)
"Ombudsman"
means electricity Ombudsman as appointed under sub-section (6) of Section 42 of
the Act;
(44)
"Premises"
means land, building or structure or part or combination thereof which includes
immovable properties, in respect of which separate meter has been installed or
required to be installed by Licensee for supply of electricity;
(45)
"Point
of Supply" means the point at the outgoing terminals of Licensee's
meter/up-to consumer's cut-out/switchgear installed in the premises of the
consumer:
Provided that in case of high tension and
extra high tension consumers, point of supply means the point at the outgoing
terminals of the Licensee's metering cubicle placed before such consumer's
apparatus;
(46)
"Rural
area" means the area covered by gram Panchayats, including major and minor
panchayats or the village and areas not notified as urbanised by Government of
National Capital Territory of Delhi;
(47)
"Sanctioned
load" means the load in kW or kVA (kilo Watt or Kilo Volt Amp) which the
Licensee has agreed to supply from time to time as per the governing terms and
conditions and shall be subject to relevant orders of the Commission, as may be
issued from time to time;
(48)
"Service-line"
means any electric supply-line through which electricity is or intended to be,
supplied:
(i)
to
a single consumer either from a distributing main or immediately from the Licensee's
premises; or
(ii)
from
a distributing main to a group of consumers on the same premises or on
contiguous premises supplied from the same point of the distributing main.
(49)
"Tariff
Order" means the Tariff Order issued by the Commission applicable to the relevant
period;
(50)
"Theft
of electricity" means theft of electricity as per Section 135 of the Act;
(51)
"Urban
areas" means all areas other than rural areas;
(52)
"Unauthorized
Use of Electricity" means usage of electricity as per Section 126 of the
Act;
(53)
"Unelectrified
area" shall mean any area or part thereof which does not have any
distribution system to cater to the demand for electricity for that area;
Regulation - 3. Interpretations:
(1)
These
Regulations shall be interpreted and implemented in a manner not inconsistent
with the provisions of the Act and the Rules and Regulations made there under.
(2)
Unless
the context otherwise requires, words or expressions occurring in these
Regulations and not defined herein but defined in the Act or CEA (Installation
and Operation of Meters) Regulations, 2006 or CEA (Measures Relating to Safety
and Electric Supply) Regulations, 2010 or Tariff Order, shall bear the same
meaning as ascribed therein and in absence thereof, the meaning as commonly
understood in the Electricity Supply Industry.
(3)
The
forms and formats to be filled as per requirement of these Regulations shall be
as notified in the Commission's Orders.
CHAPTER-II
SYSTEM, SAFETY, STANDARDS AND CATEGORIZATION OF SUPPLY
Regulation - 4. System of Supply:
(1)
The
declared frequency of the alternating current (AC) shall be 50 Hz. The Licensee
shall maintain the frequency within the frequency band as may be notified by
the Authority from time to time.
(2)
The
voltage levels for supply shall be as under:-
(i)
Low
Tension (LT)
(a)
Single
Phase: 230 volts between phase and neutral.
(b)
Three
Phase: 400 volts between phases.
(ii)
High
Tension (HT)-Three Phase: 11 kV between phases
(iii)
Extra
High Tension (EHT)-Three Phase: 33kV or 66kV between phases.
(3)
The
Licensee shall design, install, maintain and operate a distribution system in
conjunction with the transmission system.
(4)
The
voltage at the point of supply shall remain within the limits as specified
hereunder:
(i)
In
the case of low tension, + 6%.
(ii)
In
the case of high tension, + 6% to-9%.
(iii)
In
the case of extra high tension, + 10% to-12.5%.
Regulation - 5. Safety of electrical installations:
(1)
The
Licensee and the consumer shall, in every respect, comply with the provisions
of the Central Electricity Authority (Measures Relating to Safety and Electric
Supply) Regulations, 2010, as amended from time to time.
(2)
At
the time of testing of installation, if the Licensee's representative finds
that there is a defect in the consumer's wiring, the Licensee shall serve a
written notice to the consumer to make such modifications as are necessary to
render the installation safe.
(3)
The
connection shall be energized only on removal of the defects.
Regulation - 6. Classification and Categorization of Supply:
(1)
The
classification of supply shall be as notified in the Commission's Orders.
(2)
Categorization
of supply to various consumers shall be in accordance with the applicable
tariff order of Commission for that period:
Provided that no additional category other
than those approved by the Commission shall be created by the Licensee.
Regulation - 7. Wiring in the premises of the consumer:
(1)
The
work of wiring at the premises of the consumer shall conform to the standards
notified in Central Electricity Authority (Measures relating to Safety and
Electric Supply) Regulations, 2010 and amendments thereof.
(2)
All
multi-storeyed buildings, having a height of more than 15 meters from ground
level, shall also comply with Clause 36 of the Central Electricity Authority
(Measures relating to Safety and Electric Supply) Regulations, 2010 and
amendments thereof.
(3)
Wiring
shall be tested as per provisions of Clause 31 of the Central Electricity
Authority (Measures relating to Safety and Electric Supply) Regulations, 2010
and amendments thereof.
(4)
The
material used for wiring shall comply with or be superior to the standards laid
down by the Bureau of Indian Standards. The consumer shall be solely
responsible for the installation of electrical wiring within its premises as
per relevant Rules/Regulations.
(5)
All
consumers, irrespective of the sanctioned load, shall install a suitable device
for earth leakage protection within the time period as may be notified by the
Commission:
Provided that no new connection shall be
energised, unless a suitable earth leakage protection device has been
installed.
Regulation - 8. Harmonics dumping:
(1)
It
shall be obligatory for all the consumers to restrict the harmonics dumped by
them to the levels as may be notified by the Authority:
Provided that IEEE Standard (STD 519-1992)
shall be applicable, till such time the Standards are notified by the
Authority.
(2)
If
the Licensee detects that the consumer's electrical system is generating
harmonics above the permissible limits, the Licensee may require the consumer
to take appropriate measures to control harmonics of his installation in accordance
with sub regulation (1) above, within six months.
(3)
The
Consumer shall inform the Licensee about the measures taken to control
harmonics and the Licensee shall inspect within 2 (two) days of getting
information, failing which it shall be presumed that the consumer has taken
effective measures and have complied with the provisions of this Regulation.
(4)
The
Licensee shall inform the consumer about the results of inspection on the spot
and if the harmonics are within permissible limits, no further action shall be
taken.
(5)
Failure
to comply with the permissible limits of Harmonics after inspection as in
sub-regulation (3) above may attract penal charges, as may be notified by the
Commission from time to time:
Provided that, if after the inspection as in
Sub Regulation (3), in the opinion of the Licensee, the high harmonics dumping
by a consumer is detrimental to other consumers or to the distribution system,
the Licensee may, under intimation to the Commission, disconnect supply of such
erring consumer, after giving notice under Regulation 51(1), and as and when
the consumer informs the Licensee about any further measures taken to control
harmonics, the Licensee shall make re-inspection within 2 (two) days, and if
the results of harmonics during such re-inspection are found within the
permissible limits, the supply shall be reconnected within 24 hours from the
time of such re-inspection.
Regulation - 9. Distribution of electricity through franchisee:
(1)
A
Licensee may undertake distribution of electricity in a designated area within
its area of supply, through a franchisee as per the provisions of the Act:
Provided that a franchisee appointed by the
distribution licensee cannot further sub-appoint a franchisee/sub-franchisee to
undertake distribution of electricity.
(2)
Notwithstanding
the above, the distribution Licensee shall be solely responsible to the
consumer for all matters relating to the distribution of electricity through
such franchisee.
(3)
The
franchisee shall, on behalf of the Licensee, perform such duties and functions
as are assigned to him by the Licensee about distribution of electricity in the
designated area.
CHAPTER-III NEW AND EXISTING CONNECTIONS
Regulation - 10. New and Existing Connections:
(1)
General:-
(i)
The Licensee shall upload all the
forms and formats prescribed under these Regulations on its website.
(ii)
The Licensee shall make appropriate
arrangements for filing and accepting the application by the applicant both in
hard copy as well as online.
(iii)
The applicant may file the application
either online or in hard copy:
Provided that where the hard copy of application is
submitted by hand, the Licensee shall verify the application on the spot and if
found in order, acknowledge through dated receipt, and if found deficient,
issue a written note regarding shortcomings in the application:
Provided further that where application is sent by
registered post or speed post at correct postal address, the deficiency if any,
shall be sent to the applicant within 2(two) days of receipt of application
through registered post or speed post at correct postal address or on
registered mobile number through SMS:
Provided also that where the application is submitted
online, a system generated acknowledgement shall be issued forthwith and in
case of any deficiency same shall be intimated to the applicant within 2 (two)
days of the receipt of the application on registered mobile number through SMS
or registered e-mail address, as the case may be.
(iv)
The Licensee shall prominently display
consumer related information at its website and all its offices:
Provided that no other document or the charges, which have
not been listed, shall be required from the applicant.
(v)
On the request of applicant, an
independent electric connection shall be given to the owner/lawful occupant on
each floor of the premises.
(vi)
Wherever, one dwelling unit has been
sub-divided and separate kitchen as well as separate entry is available, second
electric connection may be given to the lawful occupant.
(vii)
The electricity bill shall be only for
electricity supply to the premises occupied by the consumer and shall not be
treated as having rights or titles over the premises.
(2)
Proof of identity of the applicant:-
Any of the following documents shall be accepted as proof
of identity:-
(i)
electoral identity card;
(ii)
passport;
(iii)
driving license;
(iv)
ration card having photograph;
(v)
Aadhar card;
(vi)
PAN card;
(vii)
photo identity card issued by any
Government agency;
(viii)
If the applicant is an organization,
certificate of incorporation/registration issued by the Registrar and proof of
authorization/resolution of Board for authorizing the person.
(3)
Proof of ownership or occupancy of the
premises:-
Any of the following documents shall be accepted as the
proof of ownership or occupancy of premises:-
(i)
certified copy of title deed;
(ii)
certified copy of registered
conveyance deed;
(iii)
General Power of Attorney (GPA);
(iv)
allotment letter/possession letter;
(v)
valid lease agreement along with
undertaking that the lease agreement has been signed by the owner or his
authorized representative;
(vi)
rent receipt not earlier than 3
(three) months along with undertaking that the rent receipt has been signed by
the owner or his authorized representative;
(vii)
mutation certificate issued by a
Government body such as Local Revenue Authorities or Municipal Corporation or
land owning agencies like DDA/L&DO;
(viii)
sub-division agreement;
(ix)
For bonafide consumers residing in JJ
clusters or in other areas with no specific municipal address, the licensee may
accept either ration card or electoral identity card mandatorily having the
same address as a proof of occupancy of the premises.
(4)
Sub-divided Property:-
(i)
Where property/premises have been
legitimately sub-divided, the owner/occupier of the respective portion of such
sub-divided property shall be entitled to obtain independent connection in his
name.
(ii)
The Licensee shall provide the
connection, to the applicant of respective portion of the legitimately
sub-divided property, on payment of outstanding dues on pro-rata basis for that
portion, based on the area of such sub-division or as mentioned in sub-division
agreement, and the Licensee shall not deny connection to such applicant on the
ground that dues on the other portion(s) of such premises have not been paid,
nor shall the Licensee demand record of last paid bills of other portion(s)
from such applicant(s).
(5)
Reconstruction of Existing Property:-
In case of complete demolition and reconstruction of the
premises or the building following shall apply:
(i)
Supply of electricity from existing
connection shall not be allowed to be used and same shall have to be
essentially surrendered by the owner/occupier/developer of the premises.
(ii)
Meter and service line shall be
removed, and the agreement shall stand terminated only after realizing all dues
payable to the Licensee and thereafter the security deposit of the consumer
shall be duly returned by the Licensee as per the Regulations.
(iii)
The owner, occupier, developer of the
premises, as the case may be, shall apply for temporary connection and the
Licensee shall give such temporary connection subject to Regulation 16:
Provided that temporary connection in all such cases shall
be given only after the outstanding dues, if any, for such premises, are fully
cleared.
(iv)
Such reconstructed premises or
building shall be treated as new premises and the consumer shall be required to
apply afresh for a new connection as per these regulations.
(v)
Any new connection to such
reconstructed premises shall be given only after the outstanding dues
attributed to the premises are duly paid by the applicant:
Provided that in case such reconstructed building is
occupied by multiple owners, the treatment for new connection(s) to such
multiple owners in the reconstructed building shall be given as if the property
is sub-divided as in Regulation 10(4).
(6)
Renovation of the Existing Property:-
Subject to Regulation 10 (5), renovation of the existing property
being used by the domestic consumer for their own use shall be considered under
domestic category connection on fulfillment of following conditions:
(i)
The consumer shall give advance notice
to the Licensee;
(ii)
An undertaking to be given by the
consumer to the effect that alteration/addition is as per the prevailing
Building Bye-Laws;
Regulation - 11. New Electricity Connection:
The Licensee shall process the application for new
connection, within the time frame as specified in these Regulations
(1)
Submission of application along with
all documents:-
(i)
The Applicant shall make application
for new connection to the Licensee in the form notified in the Commission's
Orders:
Provided that a non-refundable registration cum processing
fee as notified in the Commission's Orders shall be levied on the applicant
applying connection at Extra High Tension or High Tension voltage level.
(ii)
The applicant can also make
application for new connection online on the website of Licensee:
Provided that the applications for new connection for 50
kVA and above, unless any other lower value as may be notified by the
Commission from time to time, shall be submitted through online system only.
(iii)
If the Applicant wishes to provide his
own meter of approved specifications, he shall explicitly inform the same to
the Licensee at the time of making the application.
(iv)
The Licensee shall indicate all the
deficiencies in the application form to the applicant in one go only and shall
not raise any new deficiency subsequently.
(v)
In case the Licensee fails to intimate
the applicant about any deficiencies in his application on the spot or within
the stipulated 2 (two) days in case of online application, as the case may be,
the application shall be deemed to have been accepted by the Licensee on the
date of receipt of the application.
(vi)
In case the applicant fails to remove
such defects or fails to inform the Licensee about removal of deficiencies
within 30 (thirty) days from the date of receipt of intimation of deficiencies,
the application shall stand lapsed and the applicant will have to apply afresh.
(vii)
The application shall be considered to
be accepted only on removal of deficiencies as indicated under this Regulation.
(2)
Field Inspection:-
(i)
In case the application form is
complete, the Licensee shall, at the time of receipt of application form,
stipulate a date and time for inspection of applicant's premises in mutual
consultation with the applicant, giving a written acknowledgement.
(ii)
The date of inspection shall be
scheduled within 2 (two) days from the date of acceptance of the application:
Provided that if the applicant wishes to have a different
date and time for field inspection, which is beyond the stipulated date &
time, the excess time taken by the applicant shall neither be considered for
computation of total time taken for release of connection nor for the purpose
of compensation:
Provided further that if the applicant wishes, he can get
the inspection scheduled on a holiday for the Licensee, on payment of an
inspection fee as notified in the Commission's Orders.
(iii)
The Licensee shall conduct field
inspection of the premises in the presence of the applicant or his
representative on the appointed date and time.
(iv)
The Licensee shall not sanction the
load, if upon inspection, the Licensee finds that;
(a)
the information as furnished in the
application is at variance to the actual position, or
(b)
the installation is defective or
(c)
the energisation would be in violation
of any provision of the Act, Electricity Rules, Regulations or any other
requirement, if so specified or prescribed by the Commission or Authority under
any of their Regulations or Orders.
(v)
The Licensee shall give intimation to
the applicant on the spot in writing about the defects/deficiencies, if any,
observed during the field inspection.
(vi)
The applicant shall ensure that all
defects/deficiencies are removed within 30 (thirty) days from receipt of
intimation of defects/deficiencies.
(vii)
On receipt of information from the
applicant about removal of defects/deficiencies, the Licensee shall intimate
the applicant about date for re-inspection of the premises of the applicant
which shall not be later than 2 (two) days of receipt of information from the
applicant about removal of defects/deficiencies.
(viii)
In case the applicant fails to remove
such defects/deficiencies or fails to inform the Licensee about removal of
defects/deficiencies within 30 days from the date of receipt of intimation of
defects/deficiencies, the application shall stand lapsed and the applicant will
have to apply afresh:
Provided that the Licensee may grant additional time to the
applicant for completion of works, in case the applicant submits a written
request for the same, within 30 (thirty) days from the date of receipt of
intimation of defects/deficiencies.
(ix)
In case the Licensee fails to carry
out field inspection/re-inspection within 2 (two) days from the date of
acceptance of application or from the date of receipt of intimation of removal
of site defects/deficiencies, the load applied for connection shall be deemed
to have been sanctioned after 2 (two) days from the date of acceptance of the
application or the date of receipt of information for removal of
defects/deficiencies, as the case may be.
(3)
Load Sanction and Demand Note:-
(i)
Save as otherwise provided in the Act
or these Regulations, the Licensee shall sanction the load as requested by the
applicant.
(ii)
The Licensee shall raise the demand
note to the applicant, within 2 (two) days of the field inspection subject to
rectification of defects/deficiencies, for applicable charges, giving its
breakup under the heads such as Service Line cum Development (SLD) charges,
Security deposit, security towards pre-payment meter, road restoration charges,
reconnection charges, etc. after giving due adjustment for the registration cum
processing fee collected, if any, at the time of submission of the application:
Provided that in cases where consumer contribution is
required for augmentation of network, the demand note shall be raised by the
licensee within 10 (ten) days of the field inspection.
(iii)
The applicant shall make payment
within 2 (two) days of the receipt of the demand note.
(iv)
In case the applicant finds difficulty
in making the payment within 2(two) days, the applicant may request the
Licensee, in writing, for an extension of time for a maximum period of 15
(fifteen) days.
(v)
The Licensee shall be under obligation
to energise the connection on receipt of full payment against the demand note
subject to the condition that the time extended under sub-regulation (iv) above
shall not be counted in working out the total time taken for energisation of
connection by Licensee nor the consumer shall be entitled to seek any
compensation for such extended period.
(4)
Energisation of Connection:-
(i)
Where connection is to be provided
from existing distribution system in electrified areas:-
(a)
In cases where road cutting permission
or right of way is not required, the Licensee shall energize the connection
within 1(one) day from the date of receipt of full payment.
(b)
In cases where road cutting permission
or right of way is required, the Licensee shall energize the connection within
9(nine) days from the date of receipt of full payment:
Provided that if delay in road cutting permission or right
of way is beyond 2(two) days from the date of submission of request by the
distribution licensee, such delay shall not be counted in working out the total
time taken for energisation of connection by Licensee nor the consumer shall be
entitled to seek any compensation for such period.
(c)
The total time for providing
connection from existing distribution system shall not exceed the time schedule
specified under these Regulations.
(d)
For the purpose of illustration, the
total time taken for release of connection in electrified area from the
existing distribution system, where there is no deficiency in the application
or during field inspection, shall be as under:
Sl. No. |
Description |
Time period |
(i) |
Acceptance of Application |
Zero date |
(ii) |
Field Inspection |
Within 2 days of Acceptance of Application |
(iii) |
Load Sanction and demand note |
Within 2 days of Field Inspection |
(iv) |
Payment of demand note |
Within 2 days of raising demand note |
(v) |
Release of connection, where no RoW or road cutting permission is
required |
Within 1 day of receipt of payment |
(vi) |
Total time for release of connection where no RoW or road cutting
permission is required |
Within 7 days of acceptance of application |
|
Total time for release of connection where RoW or road cutting
permission is required |
Within 15 days of acceptance of application |
(ii)
Connection where system augmentation
is required in electrified areas:-
(a)
The Licensee shall not deny new
connection as long as the peak load including the load capacity of the new
connection on the applicable distribution transformer falls within and up to
90% of the rated capacity of the transformer.
(b)
The Licensee shall take appropriate
action for augmentation of the capacity, as soon as the peak load on the
existing applicable distribution transformer(s) reaches about 70% of its rated
capacity.
(c)
Subject to sub-clause (a) above, if
giving of new connection requires augmentation of distribution system, the
Licensee shall inform the applicant about the approximate time frame by which
the applied load can be energized. Such time frame shall not exceed the time
schedule specified as under:
(i) |
Electrified Areas (where extension of line upto five poles is required) |
Within 15 days from the date of receipt of full payment against demand
note. |
(ii) |
Electrified Areas (Where extension of lines or augmentation of
Distribution Transformation capacity, where peak load of transformer has
reached 90% of its rated capacity) |
Within 2 months from the date of receipt of full payment against demand
note. |
(iii) |
Electrified Areas (Where new Distribution Transformer is required) |
Within 4 months from the date of receipt of payment against demand note |
(iv) |
Electrified Areas (Where existing 11 KV network needs to be augmented) |
Within 6 months from the date of receipt of payment against demand note |
(v) |
Electrified Areas (Where existing 66/33 kV grid sub-station needs to be
augmented) |
Within 8 months from the date of receipt of payment against demand note |
Provided that the Licensee may approach the Commission for
extension of time specified in specific cases, where magnitude of
electrification works is such that it requires more time, duly furnishing the
details in support of such request for extension.
(iii)
Connection in Un-electrified areas:-
(a)
The licensee shall upload the updated
details of un-electrified areas as on 31st March of every year along with the
geographical map clearly indicating the boundaries of such areas under its
licensed area of supply by the end of April of that year:
Provided that the Licensee for the first time shall upload
the details of un-electrified areas as on 31.7.2017 along with the geographical
map clearly indicating the boundaries of such areas under its licensed area of
supply:
Provided further that the details of un-electrified areas
as on 31.7.2017 shall be uploaded by the Licensee on its website by 31.8.2017
and shall remain on its website unless reviewed by the Commission.
(b)
The Licensee shall submit in the
Business Plan, details of un-electrified areas under its area of supply and
proposal for its electrification during the control period.
(c)
The Licensee shall submit along with
the filing of tariff petition, the detailed plan for electrification of these
areas duly taking into account the number of pending applications for service
connections, potential for load growth etc.
(d)
The Licensee shall ensure that all
relevant laws of the land are complied with.
(e)
The Licensee shall complete the
electrification of un-electrified areas and release the connection within the
time schedule specified as under:
(i) |
Where connection from nearby existing network is possible |
Within 4 months from the date of receipt of approval from the
Commission, wherever required, subject to: (i) receipt of service line cum development charges under Regulation 21
from the developer or the applicant as the case may be; and (ii) availability of right of way & land, wherever required. |
(ii) |
Where new network is to be laid or grid station needs to be established |
Within 12 months from the date of receipt of approval from the
Commission, wherever required, subject to: (i) receipt of service line cum development charges under Regulation 21
from the developer or the applicant as the case may be; and (ii) availability of right of way & land, wherever required. |
Provided that on request of the licensee, the Commission
may allow extension of time for electrification works in specific cases, based
on the justification and the details furnished by the Licensee:
Provided further that once electrification of such area is
completed, the timelines for energisation of connection shall be in accordance
with the provisions of these Regulations for energisation of connection in
electrified areas.
(iv)
All connections to be energized using
bus-bars:-
(a)
If more than one connection in a
premises/complex are energized using a single service line or a cable, all such
connections shall be energized using the bus-bars only without looping with
other meters.
(b)
Any existing connection, provided
through loop connections, energized prior to 18th April, 2007 (date of
notification of Delhi Electricity Supply Code and Performance Standards
Regulations, 2007), shall be rectified and re-energized using bus-bars within 6
(six) months from the date of applicability of these Regulations.
(c)
The consumer shall have the right to
check/verify that the neutral of its meter is connected directly from the bus
bar and not in any other manner.
(d)
Subject to Sub-Clause (b) above, if it
is found that the consumer's meter is energized through neutral looping and not
directly from the bus bar, the Licensee shall be liable to pay compensation as
specified in Schedule-I of the Regulations.
(v)
Compensation for delay in energizing
connection:-
(a)
In case the Licensee fails to provide
the connection to an applicant within the prescribed time lines, the Licensee
shall be liable to pay the applicant, compensation as specified in Schedule-I
of the Regulations.
(b)
For determination of compensation, the
time taken for release of connection shall not be considered on account of the
following:-
(i)
If at any stage, additional time period
is sought by the applicant for reasons to be recorded in writing; or
(ii)
If the same is on account of reasons
such as right of way, acquisition of land, delay in permission for road cutting
etc., or occurrence of any force majeure event, over which Licensee has no
control and the reasons for the delay are communicated to the applicant within
the period specified for energisation; or
(iii)
If additional time is allowed by the
Commission for completion of work.
(c)
In case the Licensee fails to provide
connection to an applicant after raising a demand note, the Licensee shall pay
the applicant, compensation as per Schedule-I of the Regulations:
Provided that the Licensee shall also refund the amount
deposited by the applicant against the demand note along with interest as
applicable in case of Security Deposit, within 30 (thirty) days from the date
load is not sanctioned:
Provided further that if the connection could not be
provided after issuance of the demand note for the reasons attributable to the
applicant, no compensation shall be payable and the Licensee shall refund the
amount deposited by the applicant against the demand note.
(vi)
Electricity Connection based on
occupancy as per Regulation 10 (3)(v & vi):-
(a)
The Licensee shall provide the
electricity connection to such applicant only through pre-payment meter by
charging a refundable security also as notified in the Commission's Orders
towards pre-payment meter:
Provided that if the load demanded by the applicant is more
than 45kW, the Licensee may provide the connection through post-paid meter:
(b)
The electricity connection shall be
valid during the currency of said lease agreement or mutually extended period
of lease by the occupier and the owner.
(c)
The Licensee shall disconnect the
electricity connection on expiry of lease agreement, unless extended.
(d)
In case the proof of occupancy is rent
receipt along with undertaking that the rent receipt is signed by the owner or
his authorized representative, the electricity connection shall be disconnected
on the request of the owner or his authorized representative:
Provided that notice of at least one month period shall be
given by the owner or his authorized representative to the Licensee and the
occupier.
(e)
At the time of disconnection, if the
pre-payment meter is not defective/damaged, the Licensee shall refund the
security collected towards pre-payment meter along with the balance within 7
(seven) days of disconnection through demand draft or electronic clearance
system.
Regulation - 12. Single point supply:
(1)
The Licensee shall, if so requested,
give single point supply, to the premises with multiple consumers/beneficiaries
such as:
(i)
Multi-storey buildings.
(ii)
Residential complex developed by any
developer.
(iii)
Residential-cum-commercial complex
developed by a developer and approved by an appropriate authority
(iv)
Group Housing Societies
(v)
Commercial or Industrial Complex.
(vi)
Residential Complex constructed by any
employer for his employees:
Provided that the provisions of this Regulation shall not
in any way affect the right of a person residing/occupying any part/unit in
such premises, sold or leased by the developer, to demand supply of electricity
directly from the Licensee of the area.
(2)
Supply shall be provided by the
developer or registered association to the individual beneficiaries and for
common service by installing separate meters.
(3)
The developer or registered
association shall collect the charges as per applicable Tariff Order and the
cost of energy from individual beneficiaries and shall remit the charges for
the entire electricity availed at such single point of supply as per the bill
within such time as indicated in the bill.
(4)
The tariff charged from individual
beneficiaries shall be as per applicable tariff for relevant category as
notified in Tariff Order.
(5)
Providing of connection to individual
beneficiaries in such premises with multiple consumers and sharing of expenses
of consumption of electricity as per the above provisions shall not be
construed as unauthorized extension of supply or resale of energy.
(6)
The maintenance of internal
distribution network and providing services to individual beneficiaries shall
be the responsibility of the developer or registered association, as the case
may be.
(Explanation:-Registered Association means the Residents
Welfare Association or any other similar body registered with Registrar,
Co-operatives Societies, Delhi/Societies Act, 1860 which deals with the
management of various common facilities/services within the complex.)
Regulation - 13. Conversion of single point connection to individual connection:
(1)
The concerned developer or registered association
opting for Conversion of Single Point Connection to Individual Connection shall
submit to the Licensee, a certified copy of the resolution regarding the
surrender of existing Single Point Delivery connection. In such cases, the
procedure specified for full conversion at Regulation 14 shall apply.
(2)
In case, applications are received by
the Licensee from individual consumers for direct supply of electricity, the
Licensee shall undertake a joint survey with the concerned developer or
registered association within 15 (fifteen) days of the date of receipt of the
first application for direct supply. During the survey, the Licensee shall
explore the possibility of additional applicants who may like to opt for direct
supply through a written consent for proper planning and to provide the supply.
(3)
In case, after conducting joint
survey, it is found that the number of members of the society, opting for
direct supply from Licensee is 2/3rd or more of the total number of members of
the society, the complete society shall be converted for taking direct supply,
and the procedure specified for full conversion at Regulation 14 shall apply.
(4)
In case, after conducting joint
survey, it is found that the number of members of the society opting for direct
supply is less than 2/3rd of the total number of members of the society, the
procedure specified for partial conversion at Regulation 15 shall apply.
(5)
Notwithstanding the above, no further
applications for direct supply of power shall be entertained from such members
who did not opt for direct supply during the joint survey mentioned as above,
for the next 5 (five) years from the date of energisation of other applicants,.
This condition shall be clearly mentioned in the survey form.
(6)
The Licensee shall seek and the developer
or the registered association, as the case may be, shall provide the list of
all the beneficiary members of the single point connection.
(7)
The developer or the registered
association shall provide access to the premises to the Licensee or its authorized
representatives for the purpose of any activity related to conversion of single
point connection into individual connection and other services such as
maintenance, inspection of the network, reading of the meters etc.
Regulation - 14. Procedure for full conversion of single point connection into individual connection:
(1)
The concerned developer or registered
association shall submit to the Licensee, certified copy of the resolution
regarding the surrender of existing Single Point Delivery connection:
Provided that, in case of full conversion based on the
result of joint survey under Regulation 13 (3), same shall be deemed to be
resolution regarding the surrender of existing Single Point Delivery
connection.
(2)
Any connection which has been
converted from single point delivery to individual connection, shall not be
entitled to revert back to single point connection thereafter.
(3)
All members of the society opting for
direct supply shall submit an application for direct supply of electricity
individually from the Licensee in accordance with the terms and conditions
specified in these Regulations. In case, application is not received from any
of the member of the society, the supply to that member shall remain disconnected.
(4)
The concerned developer or registered
association shall apply for separate connection for common services. If the
concerned developer or registered association has already taken a separate
connection for common services, the same connection can be continued.
(5)
The Licensee shall not be required to
provide the arrangement for standby supply such as Diesel Generator (DG) set.
The developer or registered association shall arrange for separate network for
stand by supply such as DG set, if required. Any source of standby supply shall
be allowed only beyond the meter/MCB of each applicant with suitable
arrangement of changeover switch.
(6)
The Licensee shall inspect the
existing distribution system such as transformers, allied equipments, and
meters etc. of the society.
(7)
The developer or registered
association shall provide the adequate space, if required, at a convenient
place for installing the transformers, allied equipments, as may be required,
at no cost to the Licensee.
(8)
The Licensee shall enter into an
agreement with the developer or registered association for taking over of
existing distribution assets without any monetary compensation.
(9)
In order to avoid duplication of the
distribution system and as far as possible, the Licensee shall take over the
existing distribution system from the concerned developer or registered
association, within 60 days of the receipt of the certified copy of the
resolution or completion of joint survey, as the case may be, regarding
surrender of existing single point delivery connection, without giving any
monetary compensation to the developer or registered association, and the
distribution system shall, thereafter, be owned, operated and maintained by the
Licensee. Handing Over and Taking Over of the equipment shall be properly
documented.
(10)
The cost of the existing distribution
system taken over by the Licensee shall be deemed to be the notional funding
required from developer or registered association under Regulation 21 (1):
Provided that if the value of the assets taken over by
Licensee is available in the balance sheet of concerned developer or registered
association, the value of such assets may be taken for computation of
additional Repair & Maintenance based on the methodology determined by the
Commission:
Provided further that if no such data is available, the
Licensee may compute the notional value of the taken over assets from concerned
developer or registered association based on the cost data book issued by the
Commission.
(11)
The Licensee shall start installing
their meters which shall be completed within two months of the receipt of the
certified copy of the resolution or completion of joint survey, as the case may
be, regarding surrender of existing single point delivery connection.
(12)
At the time of installation of meter
by the Licensee, the concerned developer or registered association, along with
the individual consumer shall note the reading of the old meter as well as the
initial reading of the new meter.
(13)
The Licensee shall start its billing
from 1st day of the month subsequent to expiry of two months period from taking
over of the distribution network. During this period of two months before 1st
day of the month, the concerned developer or registered association shall raise
the bill based on the respective readings of their meters and the meters
installed by the Licensee, as the case may be.
(14)
The Licensee on the day of start of
its billing shall jointly record the initial reading of the meter with the
concerned developer or registered association and the consumer or his
representative.
(15)
The Licensee shall augment the system,
if required within four months of receipt of the certified copy of the
resolution regarding surrender of existing single point delivery connection and
such additional expenditure, including the cost of road fill/restoration,
removable of malba, building of new Sub-station etc. within the society, shall
be dealt as applicable for any other augmentation scheme:
Provided that the Licensee may approach the Commission for
extension of time specified in specific cases, where magnitude of augmentation
works is such that it requires more time, duly furnishing the justification in
support of such request for extension.
(16)
The Licensee shall refund the security
deposit of the surrendered Single Point Delivery connection within three months
from the date of taking over the system.
(17)
Each member of the society shall pay
required security deposit to the Licensee at the time of conversion.
Regulation - 15. Procedure for partial conversion of single point connection into individual connection:
In case the number of members of the society opting for
direct supply from Licensee after conducting joint survey are less than 2/3rd
of the total members of the society, the following shall apply:-
(1)
The member(s) opting for direct supply
shall obtain the No Objection Certificate from the developer or registered
association for taking direct supply from the Licensee.
(2)
Such member(s) shall provide the
consent of concerned developer or registered association for providing the
adequate space at a convenient place for installing the transformers, allied
equipments and meters, if required, at no cost to the Licensee.
(3)
50% cost required for providing
connection shall be borne by the applicants in the ratio of the sanctioned load
of such applicants.
(4)
Security deposit at the time of
conversion shall be payable by the applicant(s).
Regulation - 16. Temporary Connection:
(1)
The Licensee shall give temporary
connection for short-term requirements such as marriages, religious functions,
construction activities, exhibitions, cultural functions, etc. in places where
the distributing main of the Licensee are in existence:
Provided that where the distributing main is not available,
the temporary supply shall be given subject to electrification of area under
Regulation 11(4) (ii) and 11(4) (iii):
Provided further that temporary connection will be given
only in the cases of low tension and high tension categories.
(2)
The applicant shall make request for
temporary connection in the format prescribed in the Commission's Orders.
(3)
The Licensee shall inform the
applicant for obtaining No Objection Certificate or the permission from
concerned authorities such as Electrical Inspector or local authority etc, if
required, in providing temporary connection.
(4)
The applicant shall give a
declaration, that requisite No Objection Certificate (NOC) or permit, if
required for the activity for which connection is applied for, is available:
Provided that in case Licensee comes to know that any
permit or NOC is withdrawn by the competent authority after energisation of
connection, the supply shall be disconnected forthwith under intimation to the
consumer and shall be reconnected only after the permit or NOC is restored.
(5)
The Licensee shall conduct the
inspection within 2 (two) days of receipt of application and shall examine the
technical feasibility of the connection applied for from their distribution
mains and the installation of the applicant.
(6)
In case the connection is not found
technically feasible, the Licensee shall intimate to the applicant in writing
within 3 (three) days of receipt of application giving reason for the same:
Provided that no connection up to 20 kW shall be rejected
only on technical grounds, where three phase distribution network is available,
and upto 10kW, where only single phase distribution network is available.
(7)
If it is found in the inspection by
the Licensee that there are defects or deficiencies in the installation of the
applicant, the Licensee shall intimate the applicant on the spot in writing,
under acknowledgment, about the defects or deficiencies in the installation.
(8)
The applicant, after rectification of
the defects or deficiencies, shall intimate the fact to the Licensee in writing
and the Licensee shall again inspect within 2 (two) days of receipt of
intimation of rectification of the defects.
(9)
If the connection is found feasible,
the Licensee shall within 3 (three) days of inspection or re-inspection, as the
case may be, sanction the load and raise a demand note at the rate notified in
the Commission's Orders for the following charges:
(i)
one time non-refundable charge for
consumables, non-retrieval of equipment, etc.
(ii)
refundable security towards
pre-payment meter
(iii)
Security deposit towards supply of
electricity where connection is provided through post-paid meter:
Provided that in such cases the security deposit shall be
assessed for a period of twice of the days applied for temporary connection or
a period of two months whichever is lower at the applicable tariff, considering
the usage of the load for 18 hours in a day.
(10)
The applicant shall make the payment
within 2 (two) days of receipt of demand note failing which the sanction shall
stand lapsed.
(11)
After receipt of payment of applicable
charges, the Licensee shall energise the connection in accordance with the date
indicated in the application.
(12)
Temporary connection shall be granted
for a period of maximum 1 (one) year at a time, which, if required, may be
further extended.
(13)
Temporary connection shall be granted
using pre-payment meters only:
Provided that if the load demanded by the applicant is more
than 45kW, the Licensee may provide the temporary connection through post-paid
meter.
(14)
For extension of the period of
temporary connection, the consumer shall apply to the Licensee in writing at
least 1 (one) day before the date of expiry of temporary connection.
(15)
The Licensee may grant extension, if
possible on receipt of the written request and payment of applicable
electricity charges.
(16)
The applicant may get the date of
availing temporary connection postponed to a date not later than one month from
the date of original sanction, by applying to the Licensee at least 5 (five)
days before the originally sanctioned date of commencement of supply. However,
no further postponement beyond one month shall be permissible. In case the
temporary connection is not availed within such postponed period, the
application shall stand cancelled and any payment, towards non-refundable
charges shall be forfeited.
(17)
The grant of temporary connection
shall not create a right in favour of the applicant for claiming a permanent
connection.
(18)
Temporary connection shall be
terminated on expiry of period of temporary connection or as extended and the
Licensee shall finalize the bill on the basis of energy consumption and refund
the balance including the security deposit, if any and security towards
pre-payment meter in case pre-payment meter is not defective/damaged, within 7
(seven) days through demand draft or electronic clearance system.
Regulation - 17. Existing connections:
(1)
Transfer of connection
(i)
If any applicant wants transfer of
connection due to any reason such as change of consumer's name due to change in
ownership or occupancy of property, transfer to legal heir, etc. he shall apply
to the Licensee in the prescribed format as notified in the Commission's
Orders.
(ii)
Any deficiency in the application
shall be intimated in writing. The application shall be accepted only on
removal of such deficiencies.
(iii)
The request for transfer of connection
shall not be accepted unless all recoverable dues in respect of the concerned
connection are fully paid:
Provided that once connection is transferred, no
dues/arrears shall be recovered from the new consumer.
(iv)
The change of applicant's name shall
be effected within two billing cycles, after acceptance of application or
clearing of dues whichever is later.
(v)
If the change of applicant's name is
not effected within two billing cycles, the consumer shall be entitled to seek
and the Licensee shall be liable to pay the compensation as specified in
Schedule-I of the Regulations.
(2)
Load Enhancement on the request of consumer:-
(i)
The applicant shall apply for load
enhancement in the format notified in the Commission's Orders.
(ii)
The procedure as laid down in
Regulation 11 for release of electricity connection shall be followed.
(iii)
If the effective date of load
enhancement falls between the billing cycles, the Licensee shall raise the bill
on pro-rata basis during that billing cycle.
(3)
Load Reduction on the request of
consumer:-
(i)
The Application for load reduction
shall be accepted only after six months from original energisation for
connections up to 100 KW, and 1 (one) year from original energisation for
connections above 100 KW. Subsequent application for load reduction shall be
accepted once in six-months or after lock-in period of 6 (six) months pursuant
to Regulation 17(4)(vii), as the case may be.
(ii)
The applicant shall apply for load
reduction to the Licensee in the format prescribed in the Commission's Orders.
(iii)
The Licensee, after verification,
shall sanction the reduced load within 10 (ten) days from the date of acceptance
of such application.
(iv)
The load reduction shall be reflected
from next billing cycle.
(v)
If the effective date of load
reduction falls between the billing cycles, the Licensee shall raise the bill
on pro-rata basis during that billing cycle.
(vi)
The reduction of load shall be limited
to the highest of average of any 4 (four) consecutive months maximum demand
readings of last 12 (twelve) months.
(vii)
If the load reduction is not
sanctioned within the said period, the consumer shall be entitled to seek and
the Licensee shall be liable to pay the compensation as specified in Schedule-I
of the Regulations.
(4)
Review of sanctioned load/contract
demand by the Licensee:-
(i)
For revision of sanctioned load or
contract demand as the case may be, the Licensee shall take the highest of
average of Maximum Demand readings recorded as per billing cycle covering any
four consecutive calendar months in the preceding financial year i.e. from 1st
April to 31st March, rounded off to the lower integer as described in the
illustration:
Provided that the period for billing cycle shall not exceed
the period specified in these Regulations:
Provided further that the minimum sanctioned load shall be
1kW.
Illustration (a):-
-Sanctioned load in preceding financial year |
: 4kW |
-Highest of Average of MD readings |
: > 4kW and < 5 kW |
-Rounding off for revised sanctioned load |
: 4 kW |
Illustration (b):-
-Sanctioned load in preceding financial year |
: 4kW |
-Highest of Average of MD readings |
: > 6kW and < 7 kW |
-Rounding off for revised sanctioned load |
: 6 kW |
Illustration (c):-
-Sanctioned load in preceding financial year |
: 4kW |
-Highest of Average of MD readings |
: > 3kW and < 4 kW |
-Rounding off for revised sanctioned load |
: 3 kW |
(ii)
If the computed revised load pursuant
to sub-clause (i) above exceeds the sanctioned load or contract demand as the
case may be, the Licensee shall issue a separate notice to the consumer about
the proposed increase in sanctioned load or contract demand. The notice shall
contain the details of the exact readings in the consecutive billing cycle(s)
taken into consideration along with details of enhanced security deposit and
the differential Service Line cum Development (SLD) charges in case of change
of service line, if any, for such increase in sanctioned load or the contract
demand, as the case may be, in accordance with the Act to be deposited by the
consumer within 30 (thirty) days from the date of receipt of notice.
(iii)
In case of domestic category
consumers, if the computed load pursuant to sub-clause (i) above is less than
the sanctioned load or contract demand as the case may be of the consumer, the
Licensee shall seek the consent of the consumer for load reduction through a
separate notice to the consumer, giving details and information that his
maximum demand is less than the sanctioned load or contract demand:
Provided that for domestic category consumers, having the
sanctioned load upto 5kW in the last billing cycle of preceding financial year,
if no communication is received from them within expiry of 30 (thirty) days
from the date of the receipt of notice, the load shall be reduced
automatically; and for domestic consumers having sanctioned load more than 5kW
in the last billing cycle of preceding financial year, the load shall be
reduced only on receipt of consent from the consumer.
(iv)
A separate notice for upward or
downward revision of sanctioned load or contract demand as the case may be,
shall be issued by 31st May of the financial year. No notice for upward
revision shall be issued thereafter during the year.
(v)
In case a notice for downward revision
pursuant to sub clause (iv) is not issued by 31st May, the Licensee shall pay
compensation to the affected consumer as specified in Schedule-I of the
Regulations, without prejudice to the right of consumer to reduce the load
which shall be effective as per sub clause (vi) below.
(vi)
The upward or downward revision of
sanctioned load or contract demand as the case may be, shall be done once in a
financial year and shall be made effective from 1st July of the financial year.
(vii)
If the load is enhanced by the
Licensee pursuant to sub-clause (ii), the request for any load reduction shall
be entertained only after expiry of 6 (six) months from the date of enhancement
of load.
(5)
Change of category on the request of
consumer:-
(i)
The applicant shall apply for change
of category in the format prescribed in the Commission's Orders.
(ii)
The Licensee shall conduct site
inspection to verify within 7 (seven) days from the receipt of application and
shall record the meter reading at the time of inspection.
(iii)
If on inspection, the request of the
consumer for change of category is found genuine, change of category shall be
made effective from the date of inspection and the same shall be reflected in
next billing cycle.
(iv)
Arrear or excess charges shall be
determined based on the actual period of earlier classification based on
documentary evidence provided by the Licensee or the consumer as the case may
be, limited to a period of 12 (twelve) months and the account of the consumer
shall be suitably adjusted.
(v)
In case change to such category is not
permitted under any law in force, the Licensee shall inform the consumer within
7(seven) days from the date of application.
(vi)
If the category is not changed within
the said period, the consumer shall be entitled to seek and the Licensee shall
be liable to pay the compensation as specified in Schedule-I of the
Regulations.
(6)
Suo-motu reclassification of consumer
category by the Licensee:-
(i)
If it is found that a consumer has
been wrongly classified in a particular category or the purpose of supply as
mentioned in the agreement has changed or the consumption of power has exceeded
the limit of that category as per the tariff order of the Commission or the
category has changed consequent to a revision of tariff order, the Licensee
shall suo-motu reclassify the consumer under appropriate category.
(ii)
The consumer shall be informed of the
proposed reclassification through a notice with a notice period of 30 (thirty)
days to file objections, if any.
(iii)
The Licensee after due consideration
of the reply of the consumer, if any, may reclassify the consumer
appropriately.
(iv)
Arrear or excess charges shall be
determined based on the actual period of wrong classification limited to a
period of 12 (twelve) months or a period from the date of last inspection of
the installation of the consumer by the Licensee whichever is shorter and the
account of the consumer shall be suitably adjusted.
(7)
Conversion from single phase to three
phase LT and from LT to HT; and vice-versa:
(i)
All applications for change from
single phase to three phase Low Tension and from Low Tension to High Tension;
and vice-versa, as the case may be, shall be dealt as per the procedure laid
down at Regulation 11.
(ii)
The consumer shall, in case of
increase in load, pay the differential security deposit and Service
Line-cum-Development charges at the prevailing rates, and the Licensee shall,
in case of decrease in load, refund the excess security deposit.
CHAPTER-IV AGREEMENT AND MISCELLANEOUS CHARGES
Regulation - 18. Agreement:
(1)
The application form along with any
special clauses added with mutual consent shall be treated as an agreement
between the consumer and the Licensee:
Provided that such clause(s) shall not contravene the
provisions of the Electricity Act, 2003 and other Rules and Regulations in
force.
(2)
A signed copy of the agreement shall
be given to the consumer at the time of release of connection and the other
copy shall be retained by the Licensee.
Regulation - 19. Termination of Agreement:
(1)
Termination of any Agreement shall be
subject to the terms and conditions, including any special conditions of the
agreement, entered into between the consumer and the Licensee.
(2)
Save as provided in sub-regulation (1)
above and without prejudice to the rights of the Licensee or of the consumer
under the Act for recovery/payment of any amount due under the Agreement, the
Agreement may be terminated:
(i)
by the Licensee, if the power supply
to a consumer remains disconnected for a continuous period of more than 6 (six)
months for non-payment of charges or dues or non-compliance of any direction
issued under these Regulations, after giving a 15 (fifteen) days notice period
to the consumer.
(ii)
by the consumer.
(3)
In all cases of termination of
Agreement under sub-regulation (2) (ii), the Licensee shall arrange for special
meter reading, at a mutually acceptable date and prepare final bill. Such bill
shall be stamped as final bill. The agreement shall be terminated only on
payment of final bill.
(4)
On receipt of the payment of the final
bill, the Licensee shall issue receipt with 'Final Bill' stamped on it. This
receipt shall be treated as 'No dues certificate'.
(5)
On termination of the agreement, the
Licensee shall be entitled to remove the service line and other equipment of
the Licensee from the premises of the consumer.
(6)
During the period of temporary
disconnection, the consumer shall be liable to pay the fixed charges to the
Licensee.
(7)
Any application for revival of the
connection after permanent disconnection shall be treated as an application for
new connection and would be processed only after clearance of all outstanding
dues applicable, if any:
{Explanation:-For the purpose of this Regulation, permanent
disconnection shall mean, a case of Termination of agreement or where power
supply to a consumer remains disconnected for a continuous period of more than
6 (six) months and the Licensee shall be entitled to remove the service line
and other equipment of the Licensee from the premises of consumer.
Temporary disconnection shall mean when the premises of a
consumer has been disconnected due to non-payment of bills of the Licensee up
to a period of 6 (six) months and during period of Temporary Disconnection, the
Licensee shall not remove its service line and other equipment upto a period of
6 (six) months}.
Regulation - 20. Security Deposit:
(1)
Applicant/consumer shall pay security
deposit towards supply of electricity corresponding to the sanctioned load or
contract demand as the case may be, as per the rates and mode notified in the
Commission's Orders:
Provided that subject to sub-regulation (5) & (7), if
there is no change in the load of the existing consumer, no additional security
deposit shall be charged from the consumer:
Provided further that the Licensee shall accept the
security deposit in the form of Bank Guarantee issued by any scheduled bank,
from the interested applicant having contract demand of 1MVA and above:
Provided also that the consumer shall keep such Bank
Guarantee alive throughout the period during which supply of electricity is
availed:
Provided also that such existing consumers, if so desire,
may furnish security deposit in the form of bank guarantee and the amount of
security already deposited shall be adjusted/refunded by the Licensee in 12
equal installments in the bill(s).
(2)
Where pre-payment meters are used to
supply power, security deposit for supply of electricity shall not be
collected.
(3)
The Licensee shall pay to the consumer
interest on the security deposit at the rate and as per the procedure notified
in the Commission's Orders:
Provided that no interest shall be paid to the consumer who
has furnished security deposit in the form of bank guarantee.
(4)
The interest accrued during the year
shall be adjusted in the bill for the first billing cycle of the ensuing
financial year.
(5)
In cases of load reduction, the
Licensee shall refund the excess security deposit by adjusting the same in
energy bill issued in next billing cycle:
{Explanation: The excess security deposit shall be the
difference of the security deposit computed based on reduced load corresponding
to prevailing rates of security deposit on the date of load reduction and the
actual security deposited by the consumer. In case the difference is negative,
no additional security deposit shall be taken from the consumer.}
(6)
In case the refund of security deposit
is in excess of the energy bill, the security deposit shall be refunded in the
next energy bill(s). However, the Licensee shall also adjust the interest
accrued on the amount left with Licensee at the interest rate notified for
interest on security deposit.
(7)
In case of transfer of connection, the
security deposit in the name of preceding consumer shall stand transferred in
the name of new applicant:
Provided that if the existing security deposit is less than
the security deposit computed based on the load corresponding to prevailing
rates of security deposit on the date of transfer of connection, the new
applicant shall remit the balance security deposit.
(8)
In case of upward revision of
sanctioned load or contract demand of consumer, the consumer shall remit the
enhanced security deposit.
{Explanation: The enhanced security deposit shall be the
difference of the security deposit computed based on total load after
enhancement corresponding to prevailing rates of security deposit on the date
of load enhancement and the actual security deposited by the consumer.}
(9)
On termination of the agreement and
after settlement of all the dues payable to the Licensee, the Licensee shall
refund to the consumer the balance security deposit along with accrued interest
up to the date of such termination within 15 (fifteen) days after the
settlement of all dues payable to the Licensee through demand draft or
electronic clearance system:
Provided that the consumer may opt for settlement of
outstanding dues against the security deposit:
Provided further that in case of Bank Guarantee, Bank
Guarantee shall be returned to the consumer within 7 (seven) days of payment of
final bill.
Regulation - 21. Service-Line-cum Development (SLD):
(1)
Such cases where any area to be
developed is sponsored by a developer, the electrification shall be carried out
by the Licensee on payment of the applicable cost upto the point of supply by
the developer towards EHT system, HT system, LT system, civil work, service
line, street lights, road restoration charges, and supervision charges, as
specified in the Commission's Orders:
Provided that in case of shifting of equipment, the
developer shall pay entire cost to be incurred for such work:
Provided further that the Licensee shall reconcile the
amount received from the developer and the cost actually incurred and refund
the excess amount, if any, as per procedure specified in Delhi Electricity
Regulatory Commission (Terms and Conditions for determination of Tariff)
Regulations, 2017.
(2)
In case the area is electrified or to
be electrified by the Licensee, the new connection shall be released on payment
of applicable cost up to the point of supply towards EHT system, HT system, LT
system, civil work, service line, road restoration charges, and supervision
charges as specified in the Commission's Orders, by the applicant except those
covered under areas developed by a developer under sub-regulation (1) above:
Provided that the service line cum development charges shall
neither be charged nor be refunded in case of load reduction:
Provided further that if service line is actually changed
in case of enhancement of load, the differential Service Line-cum-Development
Charges shall be payable by the consumer based on the prevailing rates for
electrified areas or un-electrified areas as the case may be:
{Explanation: The differential Service-Line-cum Development
Charges shall be the difference of the Service Line cum Development Charges
computed based on total load after enhancement corresponding to prevailing
rates of Service Line cum Development Charges and the actual Service
Line-cum-Development Charges deposited by the consumer.}
Provided also that service line cum development charges
shall not be refundable in case of termination of agreement.
(3)
Road cutting permission and other
necessary clearances shall be obtained by the Licensee on behalf of the
applicant. The cost of the same shall be charged to the applicant and shall be
shown separately in the demand note.
(4)
The service line shall be maintained
by the Licensee.
Regulation - 22. Space for installation of grid substation, transformers, service line, meter and other equipment:
(1)
The developer or the applicant
applying for supply of electricity from the Licensee shall provide free of
charge, the applicable space of requisite dimensions as notified in the
Commission's Orders, at a convenient location, as may be mutually agreed
between the consumer and the Licensee, for erection and installation of grid
substations, transformers, switch gear, meter, equipment, etc.:
Provided that if there is no specific developer in an area
and the augmentation of the existing distribution system requires the space for
installation of grid substations, transformers, switch gears, etc. to meet out
the load demand, the distribution licensee shall approach the Government of
National Capital Territory of Delhi, within fifteen days of such requirement,
for allotment of space, indicating the probable space available in such areas:
(2)
Except for HT or EHT networks, the
Licensee shall have no right to utilize the sub-station in the consumer's
premises, without his consent, for the supply of electrical energy to other
consumers:
Provided that the utilization of such assets for providing
electricity to other consumers shall not in any manner affect the supply to the
consumers for which such assets were originally installed.
Regulation - 23. The safe custody of the meter and other equipment of the Licensee:
(1)
It shall be the responsibility of the
consumer to keep the meter installed within its premises in safe custody.
(2)
The meter shall, on no account be
handled or removed by any person other than a person authorized by the Licensee
for this purpose.
(3)
Seals fixed on the meters shall on no
account be tampered with, damaged or destroyed.
(4)
The service line and meter shall be
deemed to be the property of the Licensee and shall remain under his control so
long as they are connected to the distribution system of the Licensee.
Regulation - 24. Procedure for shifting electric line or electrical plant of the Licensee.
(1)
The owner of the land or his successor
in interest, who has given right of way for the construction of an existing
electric line or electrical plant over, under, along, across, in or upon the
said land, may apply for shifting the electric line or electrical plant to any
other portion of his land for genuine purposes:
(2)
The application for shifting the
electric line or electrical plant shall be submitted to the Licensee.
(3)
On receipt of the application, the
Licensee shall inspect the site and assess the technical feasibility of the
proposed shifting.
(4)
The request for shifting an electric
line or electrical plant shall be granted only if:-
(i)
the proposed shifting is technically
feasible. And
(ii)
the owner of the land or his successor
in interest gives consent in writing to shift the electric line or electrical
plant to any other portion of his land or to any other land owned by him or any
alternate right of way to be arranged by him for shifting the electric line and
the electrical plant and
(iii)
the owner of the land or his successor
in interest shall take necessary permission/approval for road cutting or right
of way, if required.
(iv)
the applicant remits the applicable
charges required for shifting the electric line or electrical plant.
(5)
The Licensee shall shift the electric
line or electrical plant, if the conditions specified in sub-regulation (4) are
complied with by the applicant.
(6)
In case of shifting of meter or
service line within the premises of the consumer, the procedure specified in
the Regulation 25 shall apply.
Regulation - 25. Procedure for shifting of meter or service line within the premises of the consumer:
(1)
The consumer shall apply to the
Licensee for shifting the meter within the existing premises or for deviation
of existing service line within his property.
(2)
The Licensee shall conduct the site
inspection.
(3)
The charges for shifting of meter and
service line for the connection on the same premises shall be as notified in
the Commission's Orders.
(4)
If shifting requires new service line,
the Licensee shall be entitled to levy the Service Line cum Development
charges.
(5)
The following time schedule shall be
observed for completing the works from the date of payment of expenditure:-
Sl. No. |
Purpose |
Time Schedule |
(i) |
shifting of meter |
7 (seven) days |
(ii) |
shifting of LT service line |
30 (thirty) days |
(iii) |
shifting of HT service line |
45 (forty five) days |
Provided that the above timelines for shifting of LT &
HT lines shall be computed after deducting the time taken for obtaining
statutory clearances/permission such as road cutting permission, if any.
Regulation - 26. Additional Charges:
The charges for installation, inspection, special meter
reading, reconnection etc. shall be charged by the Licensee as notified in the
Commission's Orders.
CHAPTER-V METERING, BILLING AND PAYMENT METERING
Regulation - 27. Requirement of meters:
(1)
The Licensee shall not supply
electricity without a meter, unless otherwise permitted by the Commission in
its Orders or Tariff Orders:
Provided that where the distribution Licensee at its own or
through its franchisee requires the supply of electricity without a meter,
shall take the prior approval of the Commission.
(2)
The Commission may, from time to time,
prescribe meters to comply with any additional features, which shall be
published by the Commission and the Licensees on their respective websites.
(3)
All new meters, at the time of
procurement, shall have the additional features as may be prescribed and
applicable under sub-regulation (2) above, on the date of such procurement.
(4)
The Commission may issue directions
for up gradation/replacement of the existing meters so as to make them
compliant to sub-regulation (3) above.
(5)
The Licensee shall provide seals or
other appropriate devices on the metering equipment to detect any interference
and shall maintain a record of all relevant security devices and seals.
(6)
If supply is provided by the Licensee
to different categories of consumers in the same premises, separate meters
shall be installed for each category of supply.
Regulation - 28. Option of the applicant/consumer to purchase the meter:
(1)
At the time of seeking a new
connection, or at the time of replacement of a meter pursuant to Commission's
direction, the applicant shall indicate his option in the application form to
procure the meter on his own:
Provided that in all such cases where the meter is procured
by the applicant, the Licensee shall reimburse the cost of meter to the
applicant as per Regulation 36 (5) and in such case, the meter shall become
property of the Licensee:
Provided further that, if any consumer elects to provide
his own meter at any stage other than at the time of new connection or at the
time of replacement of a meter pursuant to Commission's direction, the consumer
shall not be entitled to any such reimbursement and in all such cases, the
consumer shall be entitled to take back the meter purchased by him as his asset
only after it is permanently removed from the system of the Licensee.
(2)
The Licensee shall make available on
its website, an updated list of makes and specifications of meters and
associated equipment, as approved by the Licensee.
Regulation - 29. Supply and installation of meters and circuit breakers:
(1)
Check meters and stand-by meters shall
be installed wherever necessary in accordance with the provisions in the
Central Electricity Authority (Installation and Operation of Meters)
Regulations, 2006, as amended from time to time.
(2)
The consumer shall provide a lockable
and weather proof compartment or enclosure of a design approved by the Licensee
to house the meter and associated equipment including Current Transformer (CT)
and Potential Transformer (PT) etc.
(3)
The consumer shall provide suitable
and adequate space for installation of the meter, either at entry point or
outside the premises, in such a manner that it is always accessible to the
Licensee or his representatives without the need of meter reader to get the
premises unlocked or opened for this purpose.
(4)
In the case of multi-storey buildings,
the meters shall be fixed on the ground floor having proper ventilation and
adequate illumination.
(5)
The point of supply and the location
for installation of meter and other associated equipment shall be decided in
consultation with the consumer so that such locations are easily accessible for
their installation, commissioning, inspection, reading, recording and
maintenance, with minimal inconvenience or infringement upon privacy to the
owner or occupier of the premises or to his business.
(6)
All HT and EHT consumers shall provide
independent entry to the meter or metering cubicle.
(7)
The height of meter display and
location for permanent connection shall be as per the standards notified by the
'Bureau of Indian Standards (BIS) for testing, evaluation, installation and
maintenance of A.C. electricity meters-Code of practice'.
(8)
The Licensee shall install the meter,
within the time specified for release of new connection, in the presence of the
applicant/consumer or his authorized representative after giving advance
notice. The consumer or his representative shall also be entitled to witness
the sealing or removing of seals and sign on the sealing certificate.
(9)
At the time of installation of any
meter, the Licensee shall record the particulars of the meters in a format
(meter particular sheet) approved by the Commission.
(10)
The Licensee shall give, a copy of the
meter particular sheet, duly signed by the Licensee and the consumer or their
authorized representatives, and retain one such copy as acknowledgment.
(11)
Whenever a new meter is installed,
either for a new connection or for replacement, it shall be sealed in the
presence of the consumer or his authorized representative.
(12)
The seal, name plates and
distinguishing numbers or marks affixed on the said equipment or apparatus
shall not in any way be broken, erased or altered by the consumer or his
employee or any person acting on his behalf.
(13)
Treatment of meter seals shall be in
accordance with the Central Electricity Authority (Installation and Operation
of Meters) Regulations, 2006, as amended from time to time.
(14)
The consumer shall be responsible for
safe custody of meter, if the same is installed within the premises of the
consumer.
(15)
The consumer shall promptly intimate
the Licensee about any fault, accident or abnormality noticed with the meter.
(16)
It shall be the responsibility of the
Licensee to maintain the meter and keep it in good working condition at all
times.
(17)
In all such cases of permanent
connection where the metering unit is installed on any structure such as a pole
or a distribution pillar etc., outside the premises of the consumer, the
Licensee shall provide a display unit at the premises of the consumer and the
responsibility of safe custody of the metering unit shall rest with the
Licensee and safe custody of display unit shall rest with the consumer.
Regulation - 30. Reading of meters:
(1)
All meters, including meters for self
consumption of electricity by the Licensee shall be read/recorded regularly
once in every billing cycle and on special reading occasions.
(2)
The meter shall be read/recorded only by
the person duly authorized by the Licensee for this purpose, hereinafter
referred to as "meter reader" and the consumer shall extend all
facilities to read/record the meter, to the meter reader.
(3)
The Licensee shall issue proper photo
identity cards to all staff including the meter reader, who shall carry the
same, and show it to the consumer or his authorized representative during the
course of meter reading.
(4)
The meter reader may use hand held
instruments, meter reading instrument (MRI) or wireless equipment for recording
meter readings and for generation of bills on the spot.
(5)
If bills are prepared on the basis of
MRI downloads or if meter reading is taken on the basis of remote meter reading
and the consumer wishes to have a record of the reading taken, he shall be
given such details by the Licensee.
(6)
It shall be the duty of the meter
reader, to check and record the condition of light emitting diode (LED)/earth
leakage, protective seals on the meter.
(7)
In case the meter reader or any other
person duly authorized by the Licensee, observes any visible defect such as LED
indicator for earth leakage provided in the electronic meters is found to be
'ON' and/or protective seal on the metering equipment has been broken, display
not working, the same shall be informed to the consumer at the earliest, but
not later than the next bill:
Provided that if there is earth leakage in the premises,
the Licensee shall advise the consumer to get the wiring checked and leakage
removed. A written notice shall be issued to the consumer.
(8)
In case the consumer discovers that
LED indicator for earth leakage provided in the electronic meters is found to
be 'ON' and/or protective seal on the metering equipment has been broken, he
shall inform the Licensee about the same:
Provided that if there is earth leakage in the premises,
the consumer shall get the wiring checked and leakage removed.
(9)
The Licensee shall, on receiving such
intimation or on discovery based on the date of inspection or meter reading
that the seal has been broken, replace the seal within three days:
Provided that if the Licensee suspects a case of
unauthorised use of electricity or theft of electricity, the matter shall be
dealt as per provisions of tampered meter.
(10)
In case, for any reason, to be
specifically recorded, the meter is not read/recorded during a billing cycle,
the Licensee shall prepare a provisional bill based on the consumption during
the corresponding period in the previous year when readings were taken:
Provided that if the consumption during the corresponding
period in the previous year is not available, the Licensee shall take average
consumption of preceding three billing cycles or the lesser period when
readings were taken.
(11)
If the provisional billing continues
for more than one consecutive billing cycle, the consumer may refuse to pay the
payment until bill is raised by the licensee as per actual meter reading.
(12)
The amount paid as per the provisional
bill as prepared in sub-regulation (10) above shall be adjusted against the
bill raised on the basis of actual meter reading during subsequent billing
cycles:
Provided that in case meter is found to be defective before
taking actual meter reading during subsequent billing cycle, the provisional
bill raised by the Licensee shall be considered as final bill for that period.
(13)
If the consumer furnishes the meter
reading(s) himself, the billing for that billing cycles(s) shall be done based
on that/those reading(s) subject to adjustment in next billing cycle:
Provided that the consumer shall send the picture of the
meter indicating the meter reading and date of meter reading through registered
mobile or through e-mail.
(14)
The consumer, if so desire, may
request the Licensee to take a special reading, and the Licensee shall arrange
the same on chargeable basis, as per the rates prescribed in the Commission's
Order. The charges for such special reading shall be included in the consumer's
bill.
Regulation - 31. Consequence of making the meter inaccessible for reading:
(1)
If the meter is rendered inaccessible
on any meter reading date, the Licensee shall issue a 7 (seven) days prior
notice to the consumer, specifying the date and time of the meter reading for
the next billing cycle, to keep the meter accessible on such date and the time:
Provided that the consumer may request the Licensee to fix
another date and time for such meter reading.
(2)
If meter is not made accessible even
on the date specified in the notice or as mutually agreed, the Licensee shall
issue a second 7 (seven) days prior notice to the consumer, specifying the date
and time of the meter reading for the next billing cycle, to keep the meter
accessible on such date and the time.
(3)
If meter is not made accessible even
on the date specified in the notice or as mutually agreed, the Licensee shall
serve 15 (fifteen) days clear disconnection notice to the consumer:
Provided that the consumer may send the picture of the
meter indicating the meter reading and date of meter reading through registered
mobile or through e-mail.
(4)
If the consumer fails to provide access
for the meter reading even during such notice period, the Licensee may
disconnect the supply after expiry of the notice period and reconnection of
supply shall be effected only after taking the reading and payment of all the
dues by the consumer.
(5)
The provisions of the above
sub-regulations shall not apply in all such cases where the consumer whose
payment is up to date and has given an advance intimation to the Licensee of
the inaccessibility of his meter for reading, specifying the reason, and has also
deposited fixed charges for such period in advance:
Provided that, in all such cases, as and when the meter is
made accessible by the consumer for taking the meter reading, the entire
consumption shall be taken as if the consumption was for the period excluding
the intimated period of inaccessibility.
Regulation - 32. Testing of meter:
(1)
Periodical Testing of meters by the
Licensee:-
(i)
It shall be the responsibility of the
Licensee to satisfy itself regarding the accuracy of the meter before it is
installed and, if he feels so necessary, shall get them tested in an accredited
laboratory.
(ii)
Wherever the consumer opts to procure
the meter, the Licensee shall receive it and, if he so desires, get it tested
in an accredited laboratory notified by the Commission:
Provided that in the absence of an accredited laboratory
notified by the Commission, the meter shall be tested in any accredited
laboratory other than that of the Licensee:
Provided further that, subject to fulfillment of conditions
and completion of procedural requirements under Regulation 11, in all such
cases the meter shall be installed and service connection be given within a
maximum of 15 (fifteen) days from the date of receipt of meter.
(iii)
The Licensee shall, at no cost to the
consumer, conduct periodical inspection or testing or both and calibration of
the meters, as notified in the Central Electricity Authority (Installation and
Operation of Meters) Regulations, 2006, as amended from time to time, at site,
and as per the following schedule:
Railways, DMRC |
At-least once in every six months |
HT or EHT meters |
At-least once in every year |
LT 3-phase meters |
At-least once in every five years |
single phase meters |
At-least once in every five years as per IS 15707: 2006-Testing,
Evaluation, Installation and Maintenance of ac electricity meters-code of
practice based on sampling plan as specified in IS 2500(Part-I) |
(iv)
Notwithstanding anything contained in
sub clause (iii), the Licensee shall arrange the periodical testing of meters
in the institutions of public importance such as hospitals, airports, or in the
premises of continuous process industries or in the premises where life support
systems are installed, only on a mutually agreed date and time and with the
minimum interruption of supply.
(v)
Wherever applicable, Current
Transformer (CT) and Potential Transformer (PT) and the associated wiring
connections shall also be tested along with meters.
(2)
Testing of the meter in case of
dispute or on the request of consumer:-
(i)
If a consumer either disputes the result
of periodical testing by the Licensee or requests the Licensee for testing of
meter, the Licensee shall, arrange testing of the meter, within 15 (fifteen)
days of receiving the request:
Provided that the meter shall be tested at site by an
accredited laboratory notified by the Commission:
Provided further that in the absence of an accredited
laboratory notified by the Commission, the meter shall be tested in any
accredited laboratory other than that of the Licensee.
(ii)
If the meter is found to be recording
incorrectly or defective or damaged due to technical reasons such as voltage
fluctuation or transients or component failure etc., attributable to the
Licensee, the testing fee shall not be charged to the consumer:
Provided that, if during such testing, the meter is found
to be recording correctly or defective or damaged due to reasons attributable
to the consumer, the testing fee as notified in the Commission's Orders shall
be charged to the consumer by the Licensee in the subsequent bill:
(iii)
The decision of the accredited
laboratory notified by the Commission or accredited laboratory other than that
of the Licensee as the case may be, shall be final and binding on the Licensee
and the consumer.
(3)
The Licensee shall, give at-least 3
(three) days prior notice to the consumer, intimating the date, time of testing
of the meter so that the consumer or his authorized representative, if so
desires, can be present during such testing of meter.
(4)
The consumer or his authorized
representative, if so present during testing and the representative of the
Licensee shall affix signature on the test report issued by the accredited
laboratory notified by the Commission or the Licensee's laboratory, as the case
may be, as a token of having witnessed the testing.
(5)
The Licensee shall give, a copy of the
meter test report, duly signed by the Licensee and the consumer or their
authorized representatives, and retain one such copy as acknowledgment.
(6)
The Licensee or accredited laboratory,
as the case may be, shall keep record of all such meter tests and submit a
report to the Commission whenever required.
(7)
In case, during testing, the meter is
found to be inaccurate, revision of bill on the basis of percentage error from
the limits of accuracy, at applicable tariff rates, shall be done for a maximum
period of 6 (six) months or 50% of the period from the date of installation of
the meter prior to date of testing or 50% of the period from date of last
testing, whichever is shorter and the excess or deficit charges on account of
such revision shall be adjusted in the subsequent bill(s).
(8)
Testing of tampered meter:-
(i)
If the Licensee suspects a case of
unauthorised use of electricity and theft of electricity through a tampered
meter, the meter shall be tested in an accredited laboratory notified by the
Commission for that purpose:
Provided further that in the absence of an accredited
laboratory notified by the Commission, the meter shall be tested in any
accredited laboratory other than that of the Licensee.
(ii)
The Licensee shall remove the meter
from site/consumer's premises and seal it in the presence of the consumer or
his representative in a container affixing thereon paper seals which shall be
signed by both the parties. In case the consumer refuses to sign the paper
seal, the same shall be photographed and videographed.
(iii)
The Licensee shall schedule a date and
time for the testing of meters with the accredited laboratory notified by the
Commission and shall give at-least 3 (three) days prior notice to the consumer,
intimating the date and time of testing so that the consumer or his authorized
representative, if so desires, can be present during such testing.
(iv)
The Licensee shall keep the sealed
container with the meter under safe and secure custody, and hand over the same
to the accredited laboratory notified by the Commission for testing on the
scheduled date.
(v)
If at the time of handing over the
sealed container with the meter for testing to the accredited laboratory
notified by the Commission, it is found that the seal of the container is
damaged or tampered or missing, in all such cases the licensee shall replace
the meter at its own cost and shall not carry out any further proceedings or
actions against the consumer on account of tampering or suspected tampering of
the meter.
(vi)
The accredited laboratory notified by
the Commission shall test the meter on the scheduled date.
(vii)
If as a result of testing, it is
established that:
(a)
the meter was not tampered, the
licensee shall replace the meter free of charge, and it shall neither charge
any fee for testing, nor initiate any action against the consumer.
(b)
the meter was tampered, the licensee
shall initiate action against the consumer, as per the provisions of the Act
and applicable regulations for theft of electricity or unauthorized use of
electricity, as the case may be, and shall also recover the cost of meter and
the testing fee as notified in the Commission's Orders from the consumer.
Regulation - 33. Stolen Meter:
Complaints regarding stolen meters shall be entertained by
the Licensee only if they are accompanied by a copy of the First Information
Report (FIR) or the acknowledgement of the complaint lodged by the consumer
with police and in such cases, the Licensee shall also conduct an inquiry
thereto.
Regulation - 34. Replacement of Defective Meters/Burnt Meters/Stolen Meters:
(1)
In the event of suspected defective
meter or burnt meter or stolen meter, the Licensee shall restore supply through
a new meter within the time period specified under these Regulations:
Provided that, if meter cannot be replaced immediately, the
Licensee shall restore the supply without meter within the time period
specified under these Regulations after ensuring that necessary preventive
action at site is taken to avoid future loss.
(2)
In all such cases, where supply is
restored without a meter, the Licensee shall give the same in writing to the
consumer or his representative, indicating his full name, ID Card/Employee
number with signature:
Provided that pending replacement of the meter, wherever
the supply has been restored without a meter by the Licensee, a case of theft
of electricity shall not be booked for the period of supply without the meter,
and Consumer's complaint for replacement of suspected defective meter or burnt
meter or stolen meter, shall be considered sufficient for this purpose.
(3)
The Licensee and the consumer, as the
case may be, shall take necessary corrective action to avoid such damage in
future.
(4)
If as a result of inspection or
testing it is established that the meter has become defective or damaged or
burnt due to technical reasons such as voltage fluctuation, transients etc.
attributable to the Licensee, the cost of replacement of the meter and/or its
associated equipment, as the case may be, shall be borne by the Licensee.
(5)
If it is established that the meter
was rendered defective or damaged or burnt due to reasons attributable to the
consumer, such as defect in installation of the consumer, connection of
unauthorized load etc., by the consumer, the cost of replacement of the meter
and/or its associated equipment, as the case may be, shall be borne by the
consumer:
Provided that the consumer may provide his own meter and/or
associated equipment, as the case may be, to the Licensee.
(6)
In case of stolen meter, the cost of
replacement of meter and/or associated equipment, as the case may be, shall be
borne by the consumer or the Licensee, whosoever is responsible for safe
custody of meter.
{Explanation: Replacement of meter and/or associated
equipment shall mean the equipment which is required to be replaced and not the
complete arrangement.}
Regulation - 35. Replacement of Meters in Bulk:
(1)
In case where meters are to be
replaced in bulk on the direction of the Commission, the Licensee shall issue a
public notice in at least four daily newspapers in Hindi, English, Urdu and
Punjabi language at least 3 (three) days in advance, indicating the reasons for
such replacement.
(2)
The Licensee shall indicate the area
wise schedule of dates for replacement of such meters.
Regulation - 36. Cost of Meters:
(1)
The Licensee shall not require
in-principle approval of the Commission to procure the meters required for
energizing new connection.
(2)
If the meters are required to be
replaced on the directions of the Commission, for any reason whatsoever, the
Licensee shall take prior approval of the Commission to procure the meters.
(3)
If meters are replaced before its
useful life due to any reason attributable to the Licensee such as defect in
procured lot, transients in distribution system, wrong booking of cases for
unauthorized use or theft of electricity etc., the Licensee shall bear the cost
of the meters and shall not be allowed in the Annual Revenue Requirement (ARR).
(4)
If meters are replaced before its useful
life due to any reasons attributable to the consumer such as burnt meter,
unauthorized use of electricity, theft of electricity etc., the consumer shall
bear the cost of the meter as approved by the Commission based on average cost
of each type of meter, procured by the Licensee during the preceding financial
year.
(5)
If the meters are procured by the
applicant/consumer for release of new connection or pursuant to the
Commission's directions, the Licensee shall reimburse the cost of meter in the
energy bill (s):
Provided that the cost of meters to be reimbursed shall be
lower of (i) actual cost of meter procured by the applicant/consumer or (ii)
average cost of meter procured by the Licensee, during the preceding financial
year.
(6)
The Licensee shall display the cost
applicable for different types of meters on its website with detailed
computation and intimate the same to the Commission.
Regulation - 37. Adoption of new technologies for metering:
(1)
The Licensee shall prepare a plan for
adoption of new technologies in metering such as pre-payment meters, time of
the day meters (ToD), smart meters and automatic remote meter reading system
through appropriate communication system, etc. and implement the same with the
approval of the Commission.
(2)
Such meters shall conform to the
technical requirements as notified by the Central Electricity Authority
(Installation and Operation of Meters) Regulations, 2006, as amended from time
to time:
Provided that, the Licensee may, after obtaining approval
from the Commission, include in the service connection agreement, the necessary
special conditions to suit the special metering system:
Provided further that when pre-payment meters are used to
supply power, security for electricity charge shall not be collected and that
the consumers shall be eligible for a rebate as approved by the Commission for
making the pre-payment.
BILLING
Regulation - 38. General:
(1)
Save and except as provided under
Regulation 30, the Licensee shall prepare the bill for every billing cycle
based on actual meter readings including the meters installed on the premises
of Licensee for self consumption and the bill shall be delivered to the
consumer:
Provided that in case of energisation of new connection or
replacement of meter, no provisional bill shall be issued for first two billing
cycles.
(2)
The Licensee shall raise the bill for
all categories of consumers as per the billing cycle, unless there is specific
agreement between the Licensee and the consumer for generation of bills for a
different period and shall contain all the details notified in the Commission's
Orders:
Provided that if there is no specific agreement between the
Licensee and the consumer, the billing cycle shall be for minimum 30 (thirty)
days and maximum 35 (thirty five) days.
Provided further that in case of new connection, billing
cycle shall refer to the period from the date of energisation of connection to
last day of that billing cycle and in case of disconnection, billing cycle
shall refer to the period from the first day of the billing cycle of
disconnection to the date of disconnection.
(3)
The Licensee shall upload the details
of the billing cycle district wise/division wise on its website.
(4)
The Licensee shall upload the bill on
its website on the day of bill generation and inform the consumer about
issuance of the bill and its payment due date via SMS or email, as the case may
be.
(5)
The consumer shall have an option to
receive the bill either in hard copy or through electronic mode such as e-mail.
The consumer opting for receiving bill through electronic mode shall register
for the same:
Provided that the distribution licensee shall deliver the
bill both in hard copy and in electronic mode such as email for a consecutive
period of 3 (three) billing cycles from the date of registration by the
consumer:
Provided further that after a consecutive period of 3
(three) billing cycles, the Licensee may stop the delivery of hard copy of the
bill.
(6)
There shall be a gap of clear 15
(fifteen) days between the date of bill generation and due date for payment of
the bill:
(7)
The billing details of last 12
(twelve) months along with payment receipt details for all consumers shall be
made available by the Licensee on its website.
(8)
Save and except as provided under
Regulation 30, in case if a bill is raised by the Licensee for a consecutive
period of more than one billing cycle at a stretch:
(i)
The consumer shall be entitled to make
the payment in equal monthly installments based on the number of billing cycles
for which bill is raised. This shall be clearly stated in the bill.
(ii)
No late payment surcharge shall be
levied on such bills, including the installments thereof.
(9)
In case of non-receipt of original
bill, the consumer shall be entitled to get a duplicate copy of the bill from
the office of the Licensee without any cost. However, any subsequent copy of
the same bill may be obtained by the consumer on payment of a fee as notified
in the Commission's Orders.
(10)
In case of pre-paid metering, the
Licensee shall issue a statement on monthly basis to the consumer within 15
(fifteen) days of the end of the month.
(11)
In case of pre-paid metering, the
Licensee shall pay a rebate to the consumer as notified in the applicable
Tariff Order.
Regulation - 39. Billing in case of defective or damaged meter:
(1)
The consumer shall be billed on the
basis of actual average consumption recorded during the corresponding period in
the preceding year, excluding the provisional billing:
Provided that if actual consumption recorded during the
corresponding period in the preceding year is either not available or partially
available, the actual average consumption of past 6 (six) billing cycles
immediately preceding the date of meter being detected or reported defective,
excluding the provisional billing, shall be used for billing purpose:
Provided further that if the actual average consumption of
past 6 (six) months is either not available or partially available, the average
consumption for the next 3 (three) billing cycles excluding provisional billing
after the installation of new meter shall be used for billing purpose.
(2)
Charges based on the average
consumption as per sub-regulation (1), shall be levied for the period of installation
of meter or 50% of the period from the date of last testing till the date when
the meter was replaced, whichever is less:
Provided that the maximum period for the charges shall not
exceed 6 (six) months.
Provided further that the amount already paid by the
consumer, for the period meter remained defective or damaged, shall be adjusted
in this bill.
(3)
The above sub-regulations shall not be
applicable in the case of a tampered meter for which appropriate action under
the provisions of the Act shall be initiated by the Licensee.
Regulation - 40. Billing in case of burnt meter:
(1)
The electricity charges for the period
for which meter was not read, shall be billed on the basis of actual average
consumption recorded during the corresponding period in the preceding year,
excluding the provisional billing:
Provided that if actual consumption recorded during the
corresponding period in the preceding year is either not available or partially
available, the actual average consumption of past 6 (six) billing cycles
immediately preceding the date of meter being detected or reported defective,
excluding the provisional billing, shall be used for billing purpose:
Provided further that if the actual average consumption of
past 6 (six) months is either not available or partially available, the average
consumption for the next 3 (three) billing cycles excluding provisional billing
after the installation of new meter shall be used for billing purpose.
(2)
The above sub-regulation shall not be
applicable in the case of a burnt meter due to tampering or unauthorized
abstraction of electricity, for which appropriate action under the provisions
of the Act shall be initiated by the Licensee.
Regulation - 41. Billing in case of stolen meter:
The electricity charges for the period for which meter was
not read, shall be billed on the basis of actual average consumption recorded
during the corresponding period in the preceding year, excluding the
provisional billing:
Provided that if actual consumption recorded during the
corresponding period in the preceding year is either not available or partially
available, the actual average consumption of past 6 (six) billing cycles
immediately preceding the date of meter being detected or reported defective,
excluding the provisional billing, shall be used for billing purpose:
Provided further that if the actual average consumption of
past 6 (six) months is either not available or partially available, the average
consumption for the next 3 (three) billing cycles excluding provisional billing
after the installation of new meter shall be used for billing purpose.
Regulation - 42. Recovery of Arrears:
(1)
The Licensee shall indicate all
outstanding amounts whatsoever on account of demand note, assessment bills,
interest or Late Payment Surcharge, as the case may be, till the date of bill
raised etc. separately as arrear in the regular bill.
(2)
If a demand is raised on the consumer
through a separate demand note, assessment bills etc. and the same remains
unpaid, shall be included in the regular bill within next two billing cycles
and the same shall be continued to be reflected in each bill unless paid.
Provided that if the outstanding dues are not reflected
continuously as recoverable in the bill, the Licensee shall forfeit its right
to claim or recover the outstanding dues.
(3)
The Licensee shall be entitled to
recover arrears of charges or any other amount due from the consumer along with
interest or Late Payment Surcharge, as the case may be, at the rates applicable
for delayed payments from the date on which such payments became due.
(4)
Subject to Section 56 (2) of the Act,
if the consumer fails to remit the amount of arrears with interest or Late
Payment Surcharge, as the case may be, by the due date indicated in the bill or
in the demand notice, the Licensee may disconnect the supply of electricity
after giving notice and initiate proceedings for the recovery of the arrears in
accordance with the relevant legal provisions.
PAYMENT
Regulation - 43. Payment on self assessment by the consumer:
(1)
In case of non-receipt of bill, the
consumer may deposit self assessed bill, for the period for which bill has not
been received:
Provided that such self assessed electricity charges shall
not be less than the charge based on last billing cycle.
(2)
The payment so made by the consumer
shall be adjusted in the next bill.
Regulation - 44. Advance payment of anticipated bills by consumer:
If a consumer intends to make advance payment of bills, the
Licensee shall accept the same and the amount so paid shall be adjusted towards
energy and other charges in the subsequent bill(s).
Regulation - 45. Disputed bills:
(1)
Subject to rights of the consumer
under Regulation 72, any complaint with regard to the accuracy of the bill
shall be made by the consumer in writing to the officer designated by the
Licensee to issue the bill:
Provided that pending resolution of the complaint, the
consumer shall pay the amount based on average consumption of last 3 (three)
consecutive undisputed bills:
Provided further that the amount so recovered shall be
subject to final adjustment or resolution of complaint.
(2)
On a complaint by any consumer
regarding the correctness of a bill, the designated officer of the Licensee
shall immediately carry out a review:
Provided that if any additional information is required
from the consumer, the same shall be obtained.
(3)
If the review establishes that the
bill is incorrect, the designated officer of the Licensee shall issue a revised
bill with all necessary particulars, within 7(seven) days of receipt of
complaint or additional information under sub-regulation (2), whichever is
later, and appropriately adjust the account of the consumer:
Provided that if the incorrect bill is issued for a second
time in a financial year, the consumer shall be entitled to seek and the
Licensee shall be liable to pay compensation to the affected consumer as
specified in Schedule-I of the Regulations.
(4)
The consumer shall be given clear 15
(fifteen) days time for payment of the amount as per the corrected bill and he
shall not be charged any late payment surcharge if the payment is made on or
before the revised due date.
(5)
If the complaint was found to be
incorrect, the consumer shall immediately be notified and directed to make the
balance payment as per the original bill, within 7 (seven) days of such
intimation or the due date as per the original bill, whichever is later,
failing which the consumer shall be liable to pay late payment surcharge on the
balance amount if the payment is made after such due date of payment.
Regulation - 46. Payment of bills and charges for delayed payments:
(1)
The consumer shall pay to the Licensee
the full amount of the bill on or before the due date indicated therein, for
which the Licensee shall issue a receipt.
(2)
Subject to Regulation 45 (5), if the
consumer fails to remit the bill amount on or before the due date, the Licensee
shall be entitled to recover Late Payment Surcharge on the outstanding amount
of the bill at the rates notified by the Commission in applicable Tariff Order.
(3)
The Late Payment Surcharge shall be
charged proportional to the number of days of delay in receiving payment from
consumers by the distribution Licensees. Any adjustment on account of Late
Payment Surcharge shall be done in the next bill.
(4)
If the consumer fails to remit the
amount within due date, the Licensee may disconnect the supply in accordance
with the procedure specified in the Regulations.
Provided that the licensee may permit the consumer to remit
the amount of the bill with Late Payment Surcharge as specified in the
sub-regulation (2) above within an extended period of thirty days from the due
date specified in the bill.
(5)
Mode of Payment:-
(i)
The consumer shall pay the amount of
the bill in accordance with any mode of payment as notified by the Commission
in its Tariff Order.
(ii)
The Licensee shall make suitable
arrangements so as to enable the consumer to make payment of bills by cheque or
demand draft at any of the designated collection offices by post or courier,
depositing them in the drop boxes to be maintained by the Licensee at
designated locations, designated banks etc. and through bank transfer, on-line
payment, debit card, credit card and 'anywhere payment system' etc.
(6)
The Licensee shall establish
sufficient number of collection centers, including mobile collection centers,
at suitable locations with necessary facilities and provide as far as possible,
separate collection counters for senior citizens, women and differently abled
persons.
(7)
The Licensee shall make necessary
arrangements for installing drop box accepting cheque machine.
(8)
Where the due date indicated for
payment of the bill falls on a Sunday or a public holiday, the payment shall be
accepted on the next working day, without any late payment surcharge.
Regulation - 47. Receipt for the payment of the bill:
(1)
The Licensee shall give Receipt to the
consumer for every payment of bill.
(2)
Any payment received in cash shall be
credited to the account of the consumer on the date of such receipt.
(3)
In case of payment of the bill by
money order, demand draft or by cheque at designated collection offices, the
Licensee shall give credit to the account of the consumer on and from the date
of its receipt:
Provided that if the cheque issued by the consumer is
dishonoured on presentation for collection, the consumer shall be entitled to
make payment through fresh cheque and the Licensee shall give credit to the
account of the consumer on the date of its realization:
Provided further that for each case of dishonoured cheque,
the Licensee shall without prejudice to the right of the Licensee to initiate a
case under Negotiable Instrument Act, 1881 and such other laws, charge a sum as
notified in the Commission's Order from the consumer:
Provided also that, if a payment by the consumer through
cheque gets dishonoured for the second time in a consecutive period of twelve
months, the payment for next six billing cycles, shall be received only by
Demand Draft or electronic mode.
(4)
In the case of payment by on-line
transfer through bank or by on-line payment using credit card or debit card or
by remittance by bank on the standing instruction of the consumer or by any
such electronic clearing service, the amount received by the Licensee shall be
credited to the account of the consumer on the very same day of such receipt.
(5)
In all cases, including the payment in
person, the payments shall be acknowledged in the next bill.
Regulation - 48. Appropriation of the amount received:
All payments made by the consumer shall be adjusted in the
following order of priority:-
(1)
Arrears of electricity charges and
corresponding arrears of electricity duty/tax.
(2)
Current electricity charges and
corresponding current electricity duty/tax.
(3)
Miscellaneous charges.
(4)
Late payment surcharge.
Regulation - 49. Installment facility and incentive for early payment:
The Licensee may, with prior approval of the Commission,
formulate and implement a scheme including installment facility, incentive for
early payment, payment through electronic mode etc. for payment of bills by the
consumers.
CHAPTER-VI
DISCONNECTION AND RECONNECTION
Regulation - 50. Grounds for disconnection:
The Licensee shall not disconnect the supply
of electricity to any consumer except on any one or more of the following
grounds:-
(1)
If
the consumer defaults in payment of the dues payable to the Licensee within the
period stipulated in the notice.
(2)
If
the consumer is found to have indulged in theft of electricity.
(3)
If
the consumer refuses to allow a licensee or any person duly authorized by the
licensee to enter his premises or land in pursuance of the provisions of
sub-section (1) or sub-section (2) of Section 163 of the Act.
(4)
If
the Licensee is entitled to do so under an agreement with the consumer.
(5)
Failure
of consumer to comply for taking effective steps for generating harmonics
within permissible limits as per Regulation 8.
(6)
Failure
of consumer to make meter accessible as per Regulation 31.
(7)
If
the Licensee is mandated to do so by an order of a legal authority, competent
to issue such a mandate.
(8)
If
the supply of electricity to the consumer is liable to be disconnected as per
any of the provisions of the Regulations.
Regulation - 51. Procedure for Disconnection:
(1)
Save
as provided otherwise in these Regulations, the Licensee shall not disconnect
electricity supply to any consumer without issuing him a disconnection notice,
in writing, giving him at least 15 (fifteen) clear days, to be reckoned from
the date of serving the same, intimating the consumer about the grounds for
disconnection:
Provided that in the case of detection of
theft of electricity, the supply of electricity shall be disconnected
immediately as provided in subsection (1A) of Section 135 of the Act:
Provided further that in the case of
disconnection under:
(i)
Regulation
50 (1), the Licensee may disconnect the supply of electricity on expiry of the
notice period.
(ii)
Regulation
50(5), the provisions of Regulation 8 shall be applicable.
(iii)
Regulation
50(6), the provisions of Regulation 31 shall be applicable.
(iv)
Regulation
50(7), the provisions of the Order of the Legal authority shall be applicable.
(2)
The
supply shall be disconnected only if the grounds of the disconnection as
specified in the notice are not removed or rectified within the notice period.
(3)
The
supply under Regulation 50(1), 50(4), 50(5), 50(6), 50(7) shall not be
disconnected on bank holidays or after 12 noon.
Regulation - 52. Prevention from Unauthorized Reconnection:
(1)
The
consumer shall not reconnect its supply unauthorizedly from the system of the
Licensee or from the live connection of any other consumer.
(2)
In
case the consumer indulges in unauthorized reconnection from the system of the
Licensee directly, the Licensee may initiate action as per provisions of
Section 138 of the Act.
(3)
In
case the consumer indulges in unauthorized reconnection from the supply of any
other consumer, the Licensee may initiate action as per provisions of
unauthorized use of electricity against such consumer who has provided the
supply:
Provided that the pending dues of
disconnected connection shall be transferred to the account of consumer
allowing such connection.
Regulation - 53. Disconnection on Consumer's request:
(1)
In
case consumer desires his supply to be disconnected, he shall apply at least 5
(five) days in advance to the Licensee in the format prescribed in the
Commission's Order or as approved by the Commission from time to time:
Provided that the Licensee may accept a
notice of shorter period.
(2)
The
Licensee shall carryout a special reading and shall disconnect the supply on
the specified date.
(3)
The
Licensee shall prepare final bill after adjustment of security deposit within 5
(five) days from the date of disconnection including all arrears up to the date
of such billing, if any.
(4)
Upon
receipt of payment, the Licensee shall issue receipt with 'Final Bill' stamped
on it. This receipt shall be treated as 'No Dues Certificate':
Provided that if the payment is made online,
within the due date, the Licensee shall issue no dues certificate to the
consumer online.
(5)
If
the payment is not made, within the due date, the consumer shall be required to
make the payment along with late payment surcharge, if any, at the counter of
the Licensee only.
(6)
In
case the amount is to be refunded by the Licensee to the consumer, the Licensee
shall issue no dues certificate along with the final bill and shall refund the
balance security deposit along with accrued interest upto the date of such disconnection
within 15 (fifteen) days through demand draft or electronic clearance system.
(7)
Thereafter,
the Licensee shall not have any right to recover any charge(s) whatsoever for
any period prior to this date of billing.
Regulation - 54. Reconnection:
(1)
In
cases of a temporary disconnection, the Licensee shall reconnect the supply of
electricity to consumer's installation within 24 hours of payment of past dues
and all applicable charges, if any and completion of requisite formalities:
Provided that the Licensee shall intimate all
applicable charges for reconnection to the consumer in the disconnection
notice:
Provided further that if a consumer has moved
out of the country and provides the documentary evidence, the Licensee shall
not levy the reconnection charges.
(2)
In
case of a permanent disconnection, reconnection shall be made on payment of
past dues and all applicable charges, if any and completion of formalities as
required for a new connection.
(3)
In
case of disconnection of supply by the Licensee either erroneously or without
notice, the reconnection of supply shall be made within 24 hrs from the time of
such disconnection, without levy of any charges, including reconnection
charges.
CHAPTER-VII
UN AUTHORISED USE, THEFT AND OTHER IRREGULARITIES
Regulation - 55. General:
(1)
The
Licensee shall undertake proceedings against unauthorized use of electricity,
theft and other irregularities committed by the consumer in accordance with the
relevant provisions as laid down in Part XII, XIV, XV of the Act, the
Regulations and the procedure in Commission's Orders.
(2)
The
Licensee shall publish on its website, the list of the Assessing officers under
section 126 of the Act, the Authorized officers under sub-section (2) of
section 135 of the Act and the officers authorized by the Commission to
disconnect supply under sub-section (1A) of Section 135 of the Act and shall
display such list at prominent locations in its local offices.
(3)
The
Licensee shall issue photo identity cards to all the Assessing officers and
Authorized officers specifically indicating their designation and details of
authorisation.
(4)
During
the inspection of premises, in all cases, the assessing officer or the
authorized officer as the case may be, shall cause to videograph the entire
proceedings, till the completion of inspection at the premises:
Provided that the videograph shall include
acceptance or denial by the consumer of photo visiting card, signing of
inspection report, signing of seizure memo etc.
(5)
The
Licensee shall maintain and submit record of all cases booked under Section 126
of the Act and Section 135 of the Act to the Commission on monthly basis.
(6)
If
a consumer is found indulging in unauthorized use and also in theft of
electricity, the consumer shall be booked under theft of electricity.
(7)
In
case the unauthorized use of electricity is finally established, the Licensee
shall change the category of supply of the consumer from the date of inspection
and shall raise the bill as per normal applicable tariff.
UNAUTHORIZED USE OF
ELECTRICITY UNDER SECTION 126 OF THE ACT
Regulation - 56. Inspections of the premises and electrical installations by Assessing Officer:
(1)
The
Assessing officer shall promptly conduct inspection of any premises either
suo-moto or on receipt of information regarding unauthorized use of electricity
thereat:
Provided that the Assessing officer may avail
the assistance of employees of the Licensee for conducting inspection.
(2)
The
Assessing officer shall carry his visiting card bearing his photograph and
photo identity card issued under Regulation 55(3).
(3)
Photo
ID shall be shown and the visiting card bearing his photograph shall be handed
over to the consumer before entering the premises.
(4)
The
Assessing officer shall prepare an inspection/site report as per the provisions
under these Regulations.
(5)
No
case of unauthorized use of Electricity shall be booked by the Licensee in the
following cases:
(i)
where
consumer has been paying electricity charges for higher tariff category but
using electricity for lower tariff category;
(ii)
where
the consumer is drawing power more than the sanctioned load or contract demand
as the case may be within the same category of tariff; and
(iii)
where
it is incumbent upon the Licensee to suo-motu change the category of supply.
Regulation - 57. Preparation of Report by Assessing officer:
(1)
In
the event of detection of unauthorized use of electricity, the Assessing
officer shall prepare a detailed Report at site, in the manner as prescribed in
the Commission's Orders.
(2)
All
the material evidences such as tampered meter, etc. and the documentary
evidence, which are relevant to the case found during the inspection, shall be
seized under a seizure memo and sealed in the presence of the consumer or his
representative and be kept as a proof along with photography and video
recording of the premises.
(3)
A
detailed description of the material seized, including date, time and place and
name & address of witnesses to the seizure shall be recorded on the
exterior of the cover and signatures of all witnesses shall be affixed on the
sealing points:
Provided that if the witness refused to sign,
the same shall be recorded in the report and captured in the videograph.
(4)
The
Inspection Report shall be signed by the Assessing officer and a copy of the
same shall be handed over to the consumer or his representative at the site
immediately under proper acknowledgement. The other persons present at site may
also sign the inspection report.
(5)
If
consumer or his representative at site refuses to acknowledge and/or accept the
copy of the report, a copy of the report shall be pasted at a conspicuous place
in or outside the premises and photographed and video recorded. Another copy of
the same report shall be sent to the consumer under Registered Post or Speed
Post or electronically on the same day or on the next day of the inspection.
(6)
The
Inspection report shall form the basis for further action as per the provisions
contained in Regulations.
Regulation - 58. Procedure for dealing the case of Unauthorized Use of Electricity (UUE):
(1)
Provisional
assessment and Notice:-
If the Assessing officer on the basis of
Inspection Report and other materials comes to the conclusion that it is prima
facie a case of unauthorised use of electricity, he shall:
(i)
make
provisional assessment based on the best of his judgment which is reasonable in
the given circumstances and is based on all the available evidence and records.
While doing so the Assessing officer shall compute the amount payable by the
person benefited by the unauthorized use of electricity as per provision laid
down in sub-section (5) read with sub-section (6) of Section 126 of the Act:
Provided that if the period of unauthorized
use of electricity can be conclusively established, the assessment shall be
done for the entire period for which the unauthorized use was taking place and
if the period of such unauthorized use is not known or cannot be conclusively
established, the period of assessment shall be limited to 12 (twelve) months
immediately preceding the date of inspection:
Provided further that period of unauthorized
use of electricity shall be assessed based on the following factors:-
(a)
actual
period from the date of commencement of supply to the date of inspection;
(b)
actual
period from the date of replacement of component of metering system in which
the evidence is detected to the date of inspection;
(c)
actual
period from the date of preceding checking of installation by the assessing
officer to date of inspection;
(d)
data
recorded in the energy meter memory wherever available;
(e)
based
on the document being relied upon by the accused person.
(ii)
Serve
a notice along-with a provisional assessment bill and copy of videography of
inspection, within 7 (seven) days from the date of inspection or date of
receipt of meter testing report, if required, whichever is later, to the
consumer giving reasons as to why a case of unauthorised use of electricity is
being initiated against him. The notice should clearly state the time, date and
place at which the reply has to be submitted and the designation of the person
to whom it should be addressed.
(2)
Objection
against notice along-with provisional assessment:-
The consumer, on whom notice along-with a
provisional bill of assessment has been served, may file objections, if any,
before the Assessing officer, within 7 (seven) days from the date of receipt of
notice.
(3)
Personal
Hearing:-
(i)
The
Assessing officer shall arrange a personal hearing with the consumer or his
authorized representative within 7 (seven) days from the date of filing of
consumer's objections.
(ii)
At
the request of the consumer, the hearing may be arranged for a future date but
not later than 10 (ten) days from the date of filing of the objections by the
consumer.
(4)
Final
assessment Order:-
(i)
The
Assessing officer shall pass a final assessment order within 30 (thirty) days
from the date of service of the order of provisional assessment of the
electricity charges payable by such person.
(ii)
The
final order of assessment shall clearly show as to whether the case of
unauthorized use of electricity is established or not. Such Order shall contain
the brief of inspection report, submissions, oral or written, made by consumer
and reasons for acceptance or rejections of the same.
(iii)
If
no unauthorized use of electricity is established, the Assessing officer shall
pass an Assessment Order dropping the case immediately and the consumer shall
be informed accordingly with a copy to the next higher officer.
(iv)
In
case the unauthorized use of electricity is established, the Assessing officer
shall assess the electricity charges as per provisions contained in sub-section
(5) read with sub-section (6) of the Section 126 of the Act and shall pass the
final Assessment Order under sub-section (3) of Section 126 of the Act.
(v)
The
assessment of energy in the final order shall be made as per the formula
prescribed in Appendix-I to the Regulations:
Provided that if unauthorized use of
electricity is on account of wrong usage of tariff category or for the premises
or areas other than for which supply of electricity was authorised, the
Assessing officer shall take assessment of energy as recorded in the meter for
the period of assessment.
(vi)
While
making the assessment bill, the Licensee shall give credit to the consumer for
the amount already paid by the consumer for the period of the assessment bill.
(vii)
The
Final Assessment Order, shall clearly mention that the Order is appealable by
the consumer before the Appellate Authority (name, designation and address to
be mentioned) within 30 (thirty) days of serving the said order as per
provisions of sub-section (1) of Section 127 of the Act.
(5)
Billing
& payment based on final assessment Order:-
(i)
The
Licensee shall serve the bill to the consumer for charges of unauthorized use
of electricity as per the final assessment order issued by the Assessing
Officer.
(ii)
The
bill shall be payable by the consumer within 30 (thirty) days from the date of
service. The Licensee may extend the last date of payment of the assessed
amount or allow the payment in installments subject to payment of interest on
the unpaid amount for the extended period beyond 30 (thirty) days at the rate
of 16 (sixteen) percent per annum compounded every 6 (six) months.
(iii)
The
consumer shall accept the bill and deposit the assessed amount within the time
lines and manner as per sub-regulation (5) (ii) or prefer an appeal against it
before the Appellate Authority in accordance with the Act and the Regulations.
Regulation - 59. Appeal before Appellate Authority under Section 127 of the Act:
(1)
If
the consumer is aggrieved by the final assessment order issued by the Assessing
officer, he may after depositing half of the assessed amount as specified under
sub-section (2) of Section 127 of the Act, file an appeal before the Appellate
Authority under Section 127 of the Act, within 30 (thirty) days from the date
of issuance of such order, in the form and manner as prescribed in Commission's
Orders:
Provided that no appeal shall lie to the
appellate authority against the final assessment order of the Assessing
officer, if same is passed with the consent of the parties.
(2)
The
Appellate Authority, based on the evidence and the facts presented and after
hearing the parties shall pass an appropriate speaking order and send a copy of
the order to the Assessing officer and the appellant.
(3)
The
order passed by the Appellate Authority shall be final.
(4)
In
case the Appellate Authority holds that no case of unauthorized use of
electricity is established, no further proceedings shall be initiated or
continued by the Licensee in this regard and the amount deposited by the
appellant shall be refunded along with interest at the rate of 16 (sixteen)
percent per annum compounded every 6 (six) months for the period from the date
of deposit till the amount is refunded.
(5)
In
case the Appellate Authority holds that a case of unauthorized use of electricity
is established, the Licensee shall serve the revised bill to the consumer for
charges of unauthorized use of electricity as per the final order issued by the
Appellate Authority.
(6)
The
bill so prepared based on the final order issued by the Appellate Authority
shall be payable by the consumer within 30 (thirty) days from the date of
service. The Licensee may extend the last date of payment of the assessed
amount or allow the payment in installments subject to payment of interest on
the unpaid amount for the extended period beyond 30 (thirty) days at the rate
of 16 (sixteen) percent per annum compounded every 6 (six) months as per
sub-section (6) of Section 127 of the Act.
(7)
In
case the amount payable as determined by the Appellate Authority is less than
the amount already deposited by the consumer at the time of filing the appeal,
the excess amount shall be refunded by the Licensee within 30 (thirty) days:
Provided that if the refund is delayed by the
Licensee, interest at the rate of 16 (sixteen) percent per annum compounded
every 6 (six) months shall be paid for the delayed period.
THEFT OF ELECTRICITY
UNDER SECTION 135 OF THE ACT
Regulation - 60. Inspections of the premises and electrical installations by Authorized officer:
(1)
The
Authorized officer shall promptly conduct inspection of any premises either
suo-moto or on receipt of information regarding theft of electricity:
Provided that the Authorized officer may
avail the assistance of employees of the Licensee for conducting inspection.
(2)
The
Authorized officer shall carry his visiting card bearing his photograph and
photo identity card issued under Regulation 55(3).
(3)
Photo
ID shall be shown and visiting card bearing his photograph shall be handed over
to the consumer or the occupier of the premises before entering the premises
and take the acknowledgment.
(4)
The
Authorized officer shall prepare an inspection report as per the provisions
under these Regulations.
Regulation - 61. Preparation of Report by Authorized officer:
(1)
In
the event of detection of theft of electricity, the Authorized officer shall
prepare a detailed Report at site, in the manner as prescribed in the
Commission's Orders.
(2)
All
the material evidences such as tampered meter, tampered meter seal and
artificial means used for illegal abstraction of energy and the documentary
evidences etc., which are relevant to the case and found during the inspection,
shall be seized under a seizure memo and sealed in the presence of the consumer
or his authorized representative and be kept as a proof along with photography
and video recording of the premises.
(3)
A
detailed description of the material seized, including date, time and place and
name & address of witnesses to the seizure shall be recorded on the
exterior of the cover and signatures of all witnesses shall be affixed on the
sealing points:
Provided that if the witness refuses to sign,
the same shall be recorded in the report and captured in the videography.
(4)
The
inspection Report shall be signed by the Authorized officer and a copy of the
same shall be handed over to the consumer or his representative at the site
immediately under proper acknowledgement. The other persons present at site may
also sign the inspection report.
(5)
If
consumer or his representative at site refuses to acknowledge and accept the
copy of the report, a copy of the report shall be pasted at a conspicuous place
in or outside the premises and photographed and/or video recorded. Another copy
of the same report shall be sent to the consumer under Registered Post or Speed
Post or electronically on the same day or on the next day of the inspection.
(6)
The
inspection report shall form the basis for further action as per the provisions
contained in Regulations.
Regulation - 62. Procedure for prosecution for Theft of Electricity:
(1)
The
prosecution for theft of electricity under section 135 of the Act shall be
initiated only in the cases where dishonest intention is evident from the
relevant facts, records and other evidence of the case.
(2)
In
case sufficient evidence is found to establish theft of electricity, the
Authorized officer under sub-section (2) of Section 135 of the Act shall seize
and seal all material evidence including wires/cables, meter, service line
etc., from the premises under a seizure Memo.
(3)
The
supply of the consumer shall be disconnected immediately on detection of theft
only by such officer of the Licensee or supplier as authorised for the purpose
by the Commission, under sub-section (1A) of Section 135 of the Act:
Provided that such officer shall lodge a
complaint in writing in Police Station having jurisdiction over the site of
occurrence of the offence within twenty four hours from time of such
disconnection:
Provided further that such officer shall also
send to the consumer a copy of complaint lodged in Police Station, copy of
speaking order under Regulation 64 along with a copy of videography of
inspection within 2 (two) days of such disconnection.
(4)
No
case for theft shall be booked only on account of missing of the seals on the
meter or on account of breakage of glass window of the meter, unless dishonest
intention is corroborated by consumption pattern of consumer or any other
evidence.
(5)
Interference
with the accurate registration of energy consumed by resorting to external
methods involving remote control, high voltage injection etc., committed by the
consumer or his employee or any other person acting on his behalf, shall also
constitute theft of electricity which may be established by analysis of
metering data and by testing of the meter in an accredited laboratory notified
by the Commission or by the agency authorized by the Commission in this regard.
Regulation - 63. Assessment Bill for theft of electricity:
(1)
The
Assessing officer shall assess the energy for theft of electricity as notified
in the Appendix I to the Regulations.
(2)
The
period of assessment for theft of electricity shall be for a period of 12
(twelve) months preceding the date of detection of theft of electricity or the
exact period of theft if determined, whichever is less: Provided further that
period of theft of electricity shall be assessed based on the following
factors:-
(i)
actual
period from the date of commencement of supply to the date of inspection;
(ii)
actual
period from the date of replacement of component of metering system in which
the evidence is detected to the date of inspection;
(iii)
actual
period from the date of preceding checking of installation by authorized
officer to date of inspection;
(iv)
data
recorded in the energy meter memory wherever available.
(v)
based
on the document being relied upon by the accused person.
(3)
The
assessment bill shall be prepared on two times the rate as per applicable
tariff.
(4)
While
making the assessment bill, the Licensee shall give credit to the consumer for
the electricity units already paid by the consumer for the period of the
assessment bill.
(5)
The
assessment order shall be served upon the consumer or the person in occupation
or possession or in charge of the place or premises, as the case may be, within
7 (seven) days of disconnection of supply or within 2 (two) days from the date
of receipt of request of such person, whichever is earlier.
Regulation - 64. Suspected Theft:
(1)
In
all such cases where theft cannot be established on inspection but the theft is
suspected based on the consumption pattern, etc., the Authorized officer may
remove the old meter under a seizure memo and seal it in the presence of the
consumer or his representative which shall be signed by both the parties, and
shall restore the supply to the consumer with a new meter:
Provided that if the consumption pattern for
last 1 (one) year is reasonably uniform and is not less than 75% of the
assessed consumption, no further proceedings shall be taken and the decision
shall be communicated to the consumer within 3 (three) days:
Provided further that if the consumption
pattern is uniform as above, the existing meter shall not be sent for any
further testing.
(2)
The
meter shall be tested as per sub-regulation (8) of Regulation 32.
(3)
If
the Assessing officer, on the basis of Inspection Report, consumption pattern,
results of meter testing, comes to conclusion that it is prima facie a case of
theft of electricity, procedure as specified in the Regulation 62 &
Regulation 63 shall be followed:
Provided that the Assessing officer shall
pass a Speaking Order substantiating the case of theft of electricity within 7
(seven) days of meter testing report.
Regulation - 65. Compounding of the offence under section 152 of the Act:
The compounding of offence under section 152
of the Act shall be done only by the Government of National Capital Territory
of Delhi or by an officer duly authorized by the Government of National Capital
Territory of Delhi (compounding officer) for this purpose.
Regulation - 66. Restoration of supply disconnected on account of theft of electricity:
(1)
The
Licensee shall restore supply of electricity to the premises within 48 hours of
payment by the consumer of amount
(i)
assessed
in accordance with Regulation 63 or
(ii)
allowed
to be deposited by any court including the Lok Adalat.
(2)
If
the assessed amount is deposited by an applicant who is not an existing
consumer, the supply to the premises will be released treating it as a case of
a new connection.
(3)
The
restoration of supply of electricity shall be without prejudice to the right of
the Licensee to initiate the criminal proceedings against the existing consumer
as per Section 135 of the Act.
Regulation - 67. Voluntary disclosure of tampered meter:
(1)
In
case a consumer comes forward and voluntarily declares tampering of meter
and/or seals, the Licensee shall immediately replace the tampered meter with a
new meter:
Provided that voluntarily disclosure of
tampered meter shall be allowed only once to a consumer.
(2)
The
Assessing officer shall assess the energy for theft of electricity as notified
in the Appendix I to the Regulations.
(3)
The
assessment bill shall be prepared on two times the rate as per applicable
tariff for the period of last 6 (six) months reckoned from the date of
declaration.
(4)
While
making the assessment bill, the Licensee shall give credit to the consumer for
the electricity units already paid by the consumer for the period of the
assessment bill.
(5)
The
energy bill for the period from the date of declaration of tampered meter to
the date of replacement of meter shall be calculated as per the procedure for
defective meters.
(6)
The
Licensee shall not move the Special Court or initiate any other action if a
consumer voluntarily declares the tampered meter and pays the assessment bill:
Provided that if the consumer fails to pay
the assessment bill within 30 (thirty) days, the Licensee shall treat it as a
theft case under Regulation 62 and proceed accordingly.
CHAPTER-VIII
COMPLAINT HANDLING PROCEDURE
Regulation - 68. General:
(1)
Complaints
regarding release of electricity connection, no current/failure of power
supply, voltage fluctuation, load shedding, scheduled outages, metering,
billing and other complaints shall be addressed by the Licensee as per the
procedure specified in the Regulations.
(2)
Every
Licensee shall prepare the "Manual of Practice for Handling Consumer
Complaints/Consumer Charter/Complaint Charter", herein after referred to
as "Manual" within three months from the date of applicability of
these regulations, and submit the same to the Commission for approval.
(3)
The
Manual shall contain information which may affect the consumers, including
information related to channels of complaint registration, details of
personnel, offices, helpline nos., process of handling complaints etc.
(4)
The
Manual shall be prepared in English and Hindi languages and shall be available
for reference of consumers at every office of the Licensee and downloadable
from its website.
(5)
The
Licensee shall establish various modes for lodging complaints such as call
centre, website, SMS, application server of the Licensee or any other mode as
may be found fit by the Licensee or notified by the Commission.
Regulation - 69. Procedure for lodging complaint:
(1)
The
consumer or applicant can lodge complaint at Centralized Call Centre/Complaint
Centre at zones/district offices of the Licensee or on telephone or website or
SMS or application server of the Licensee or through post.
(2)
All
complaints received shall be routed through their complaint management system.
(3)
A
unique complaint number shall be generated and intimated to the complainant
immediately on receipt of such complaint:
Provided that in case complaint is received
through post, the same shall be intimated within 3 (three) days from the date
of receipt.
(4)
The
contact numbers of these centers shall be printed on the electricity bill,
displayed at the Bill Collection centers and uploaded on the Licensee's
website.
(5)
The
consumer or applicant shall give the details of name, address, CA number or
registered telephone number, and brief nature of the complaint.
(6)
The
Licensee shall keep a record of all complaints received through any mode for a
period of 7 (seven) years.
(7)
After
redressal of the complaint, a reply shall be communicated to the complainant.
Regulation - 70. Procedure for redressal of complaint on no current/failure of power supply:
(1)
In
case the Centralized Call Center is aware about the reason of power failure of
the complainant, the complainant shall be informed about the reason and the
approximate time required for restoration of power supply.
(2)
However,
such complaint shall be registered and a unique complaint number shall be
issued.
(3)
The
Centralized Call Center shall forward the complaint to the concerned Complaint
Center.
(4)
The
complaint shall be resolved within the timelines as specified under these
Regulations.
(5)
The
details of scheduled Power Outages shall be informed to the consumers in the
manner notified in the Commission's Orders.
(6)
The
Licensee shall keep a record of all scheduled power outages and unscheduled
power outages separately and the extent of consumers affected by each power
outage.
(7)
If
the Licensee fails to restore the supply within the specified timelines,
compensation shall be paid to the affected consumers as specified in Schedule-I
of the Regulations.
Regulation - 71. Procedure for redressal of complaint on low/high voltage:
(1)
The
Centralized Call Center shall forward the complaint to the concerned Complaint
Center.
(2)
The
complaint shall be resolved within the timelines as specified under these Regulations:
Provided that the resolution of the complaint
requires up-gradation in the distribution line, transformers, etc. the Licensee
shall take the appropriate steps.
Regulation - 72. Redressal of Grievances by Forum and Ombudsman:
(1)
In
case, the grievances of the consumer are not addressed properly by the
Licensee, the consumer may approach the Forum or the Ombudsman as the case may
be as per Delhi Electricity Regulatory Commission (Guidelines for establishment
of Forum for redressal of grievances of the consumers and Ombudsman)
Regulations, 2003 as amended from time to time.
(2)
While
communicating the decision on the grievances, the Licensee shall advise the
consumer in writing about his right to prefer an application against the
decision of the Licensee before the Forum and further to prefer appeal before
the Ombudsman.
(3)
The
address and contact number of the Forum and Ombudsman shall be made available
on the electricity bill by the Licensee.
CHAPTER-IX
GUARANTEED AND OVERALL STANDARDS OF PERFORMANCE
Regulation - 73. Guaranteed standards of performance:
The Standards specified in the Schedule-I
shall be the Guaranteed Standards of Performance, being the minimum standards
of service that a Licensee shall achieve, and the Standards specified in the
Schedule-II shall be the Overall Standards of Performance which the Licensee
shall seek to achieve in the discharge of his obligations as a Licensee.
Regulation - 74. Determination of Compensation:
(1)
The
Licensee shall be liable to pay compensation to the affected consumers, in case
of his failure to meet the Guaranteed Standards of Performance as specified in
Schedule-I of the Regulations:
Provided that the claim for compensation for
violation of provisions of any other Regulations not specified in Schedule-I of
these Regulations may be filed before the Commission.
(2)
The
compensation paid by the Licensee shall not be allowed to be recovered in the
Annual Revenue Requirement (ARR) of the Licensee..
Regulation - 75. Penalty:
(1)
The
Commission may impose penalty, on case to case basis:
(i)
for
non-achievement of any target for overall standards of performance
(ii)
for
violation of any of the provisions of these Regulations or any of the
directions/advice/orders issued by the Commission.
(2)
The
penalty paid by the Licensee shall not be allowed to be recovered in the Annual
Revenue Requirement (ARR) of the Licensee.
Regulation - 76. Procedure for Determination and payment of compensation amount:
(1)
The
Licensee shall provide information to consumers with regard to its
offices/designated officers to settle claims for compensation.
(2)
Any
person who is affected by the failure of the Licensee to meet the standards of
performance specified herein and who seeks to claim compensation shall file his
claim, with such a Licensee within a maximum period of 60 (sixty) days from the
time such a person is affected by such failure of the Licensee to meet the
standards of performance:
Provided that the Licensee shall compensate
the affected person(s) within a maximum period of 90 (ninety) days from the
date of filing his claim.
(3)
In
case failure of power supply is affecting one consumer, the default for the
purpose of claiming compensation in such case shall be considered from the time
the consumer has made the complaint.
(4)
In
case failure of power supply is affecting more than one consumer, the default
for the purpose of claiming compensation in such case shall be considered from
the time first consumer has made the complaint.
(5)
In
case the Licensee refuses to pay the compensation, the Licensee shall record
the reasons in writing, giving due justification for their action and
communicate the same to the consumer.
(6)
In
case the Licensee refuses to pay the compensation or if the affected person is
aggrieved by non-redressal of his grievances, the aggrieved person can approach
the respective Forum for redressal of grievances to seek such compensation.
(7)
If
the aggrieved person is not satisfied with the decision of the Forum, the affected
consumer may approach the Ombudsman.
(8)
If
the claim for compensation is upheld by the Forum or Ombudsman, as the case may
be, after following due process of Law, the compensation shall be determined in
accordance with the Schedule-I of these Regulations:
Provided that the Forum or the Ombudsman may
in addition to the compensation, award interest at the bank rate for the period
from date when the compensation became first due:
Provided further that the compensation shall
be payable but not later than 90 (ninety) days from the date of a direction
issued by the Forum or by the Ombudsman, as the case may be.
(9)
All
payments of compensation shall be made by way of adjustment against current
and/or future bills for supply of electricity:
Provided that the compensation is paid to the
applicant who is not consumer, the Licensee shall compensate by any mode of
payment approved by the Commission other than cash.
Regulation - 77. Information on Standards of Performance:
(1)
For
Guaranteed Standards of Performance, Licensee shall furnish to the Commission,
in a report for every month and in a consolidated annual report, the following
information:
(i)
The
levels of performance achieved by the Licensee with reference to the standards
specified in Schedule-I as per the formats prescribed in Commission's Orders;
(ii)
The
number of cases in which compensation were payable under these Regulations, and
the aggregate amount of the compensation payable and paid by the Licensee as
per the formats prescribed in the Commission's Orders;
(iii)
The
number of claims made by consumers against the Licensee for failure to meet the
Guaranteed Standards of Performance and the action taken by the Licensee
including the reasons as to delay in payment, or non-payment of compensation
for such claims;
(iv)
The
measures taken by the Licensee to improve performance in the areas covered by
Guaranteed Standards and Licensee's targets of improved performance for the
ensuing year; and
(v)
Status
of number of cases booked under unauthorized use of electricity and theft of
electricity.
(2)
The
monthly report under clause (1) above, shall be furnished to the Commission
within 15 (fifteen) days of the close of the month and the annual report under
the clause (1) shall be furnished to the Commission within 30 (thirty) days of
the close of the financial year.
(3)
The
Licensee shall furnish to the Commission, in a report as per the formats for
every quarter and in a consolidated annual report for each financial year, the
following information as to the Overall Standards of Performance:
(i)
The
level of performance achieved with reference to those specified in Schedule-II
as per the format prescribed in the Commission's Orders; and
(ii)
The
measures taken by the Licensee to improve performance in the areas covered by
Overall Standards and Licensee's targets of improved performance for the
ensuing year.
(4)
The
Quarterly report under clause (3) shall be furnished to the Commission within
15 (fifteen) days of the close of the quarter and the annual report under the
said clause (3) shall be furnished to the Commission within 30 (thirty) days of
the close of the financial year.
(5)
The
Commission may, as it deems fit and at such intervals, publish any information
or part thereof, as furnished by the Licensee under these Regulations and not
inconsistent with the Act.
CHAPTER-X MISCELLANEOUS
Regulation - 78. Notice to the Consumer:
(1)
Any
order/notice to the consumer by the Licensee under these regulations, including
the notice under the Act shall be deemed to be duly served by the Licensee if
it is:
(i)
Sent
by registered post or speed post at the correct postal address of the
addressee, or
(ii)
Delivered
by hand to the person residing at the address notified to the Licensee by the
consumer after obtaining signed acknowledgment receipt, or
(iii)
Affixed
at a conspicuous part of such premises and photographed in case there is no
person to whom the same can or person is refusing to accept the notice, with
reasonable diligence, be delivered, or
(iv)
Sent
through electronic mode such as on the registered e-mail address:
Provided that the consumer shall also be
informed by the Licensee through SMS.
(2)
Except
as otherwise specified herein above, the date of any notice shall be deemed to
be the date:
(i)
if
sent by registered post or speed post-seven (7) days from the date of posting.
or
(ii)
if
delivered personally-the date of receipt or
(iii)
if
affixed at conspicuous part of such premises-the date of such affixing.
(iv)
If
sent through electronic mode-date after 24 hours of sending.
(3)
The
responsibility of showing the proof that order/notice has been issued shall be
of the Licensee.
Regulation - 79. Accident at the installation of the consumer:
(1)
If
any electrical accident; fatal, serious or minor, occurs within the
installation of the consumer or from the service line to his installation, the
consumer shall immediately switch off the supply and report the matter to the
Licensee who shall inform the Electrical Inspector forthwith.
(2)
In
the event of any defect or leakage of energy being detected in the installation
of the consumer or in any apparatus connected to it, the same shall be
disconnected forthwith.
(3)
The
Licensee may disconnect the supply until the defects are rectified, giving
simultaneous intimation to the consumer and the Electrical Inspector.
(4)
The
installation of the consumer shall be reconnected by the Licensee only under
intimation to the Electrical Inspector.
Regulation - 80. Demand Side Management:
It shall be the duty of the consumer to stop
wastage and inefficient use of electricity and to extend necessary cooperation
to the Licensee in implementation of the programme that may be launched by the
Licensee for demand side management.
Regulation - 81. Applicants/Consumers covered under Delhi Electricity Regulatory Commission (Net Metering for Renewable Energy) Regulations, 2014:
Notwithstanding anything to the contrary
contained in Delhi Electricity Regulatory Commission (Net Metering for
Renewable Energy) Regulations, 2014 and amendments thereof, the
applicant/consumer shall be governed by the provisions of Delhi Electricity
Regulatory Commission (Supply Code and Performance Standards) Regulations,
2017.
Regulation - 82. Applicants/Consumers covered under Delhi Electricity Regulatory Commission (Terms and Conditions of Open Access) Regulations, 2005:
Notwithstanding anything to the contrary
contained in Delhi Electricity Regulatory Commission (Terms and Conditions of
Open Access) Regulations, 2005 and amendments thereof including the Orders made
thereunder, the applicant/consumer shall be governed by the provisions of Delhi
Electricity Regulatory Commission (Supply Code and Performance Standards)
Regulations, 2017.
Regulation - 83. Exemption:
(1)
The
standards of performance specified in this Regulation shall remain suspended
during Force Majeure conditions such as war, mutiny, civil commotion, riot,
flood, cyclone, lightning, earthquake, lockout, fire, sabotage, blockade etc.,
affecting the Licensee's installations and activities.
(2)
Non-compliance
of a standard contained in this Regulation shall not be treated as a violation,
and the distribution licensee shall not be required to pay any compensation to
affected consumer (s), if such violation is caused due to State Transmission
Utility and/or Central Transmission Utility, grid failure, a fault on the
Transmission Licensee's network or on account of instructions given by State
Load Dispatch Center, or any other reason, over which the distribution licensee
has no reasonable control.
Regulation - 84. Issue of Order (s) and Practice Directions:
Subject to the provision of the Act and these
Regulations, the Commission may from time to time, issue Order (s) and Practice
directions in regard to the implementation of these Regulations and procedure
to be followed on various matters, which the Commission has been empowered by
these Regulations to direct, and matters incidental or ancillary thereto.
Regulation - 85. Power of relaxation and power to remove difficulties:
(1)
The
Commission may, in public interest and for reasons to be recorded in writing,
relax any of the provisions of these Regulations.
(2)
If
any difficulty arises in giving effect to the provisions of these regulations,
the Commission may, by any general or special order, make such provisions, not
inconsistent with the provisions of the Act, which appears to be necessary or
expedient for the purpose of removing the difficulties.
Regulation - 86. Saving of Inherent Powers of the Commission:
Nothing contained in these Regulations shall
limit or otherwise affect the inherent powers of the Commission from adopting a
procedure, which is at variance with any of the provisions of these
Regulations, if the Commission, in view of the special circumstances of the
matter or class of matters and for reasons to be recorded in writing, deems it
necessary or expedient to depart from the procedure specified in these
Regulations.
Regulation - 87. Power to Amend:
GUARANTEED STANDARDS OF PERFORMANCE
AND COMPENSATION TO CONSUMERS IN CASE OF DEFAULT
Sl. No. |
Service Area |
Standard |
Computation of period of default |
Compensation payable to consumer for the period of default in case of
violation of standard |
(1) |
(2) |
(3) |
(4) |
(5) |
1. |
Connection where no Network augmentation is required |
|
|
|
|
Release of connection in electrified areas |
As per Regulation 11 |
From 8th day from the acceptance of application in case where no RoW or
road cutting permission is required or From 15th day from the acceptance of
application in case where RoW or road cutting permission is required, as the
case may be. |
1.5% of the demand charges deposited by consumer for each day of
default. |
2. |
Connection where Network augmentation is required |
|
|
|
(i) |
Release of connection in Electrified Areas (where extension of line
upto five poles is required) |
As per Regulation 11 |
From 16th day from the date of receipt of full payment against demand
note. |
1.5% of the demand charges deposited by consumer for each day of
default |
(ii) |
Release of connection in Electrified Areas (Where extension of lines or
augmentation of Distribution Transformation capacity, where peak load of
transformer has reached 90% of its rated capacity) |
As per Regulation 11 |
After 2 months from the date of receipt of full payment against demand
note. |
|
(iii) |
Release of connection in Electrified Areas (Where new Distribution
Transformer is required) |
As per Regulation 11 |
After 4 months from the date of receipt of payment against demand note |
|
(iv) |
Release of connection in Electrified Areas (Where existing 11 kV
network needs to be augmented) |
As per Regulation 11 |
After 6 months from the date of receipt of payment against demand note |
|
(v) |
Release of connection in Electrified Areas (Where existing 66/33 kV
grid sub-station needs to be augmented) |
As per Regulation 11 |
After 8 months from the date of receipt of payment against demand note |
|
3. |
Connection in Un-electrified Areas |
|
|
|
(i) |
Release of connection in Un-Electrified Areas (Where connection from
nearby existing network is possible) |
As per Regulation 11 |
After 4 months from the date of receipt of payment against demand note. |
1% of the amount deposited by developer/applicants per day of default. |
(ii) |
Release of connection in Un-Electrified Areas/Green Field Projects (Where new network is to be laid or grid station needs to be
established) |
As per Regulation 11 |
After 12 months from the date of receipt of payment against demand
note. |
|
4. |
In case connection is denied after receipt of payment against demand
note |
- |
- |
1.5% of the demand charges deposited by consumer for each day of
default subject to maximum of the amount paid as per demand note. Default to
be computed from the date of receipt of payment |
5. |
Connection energized through loop |
As per Regulation 11 |
|
Rs. 500 per kW of sanctioned/contract demand |
6. |
Transfer of name |
Within two billing cycles of acceptance of application or clearing of
dues whichever is later |
From the next day of issuance of second bill. |
Rs. 100 for each day of default. |
7. |
Load reduction |
Within ten days of acceptance of application, shall be effective from
next billing cycle |
From the 11th day of acceptance of application |
Rs. 100 for each day of default |
8. |
If notice for downward revision if any is not sent |
By 31st May |
- |
Rs. 500 for each case |
9. |
Change of category |
As per Regulation 17 (5) |
From the 8th day of receipt of application |
Rs. 100 for each day of default |
10. |
Billing |
|
|
|
(i) |
Error in billed amount |
Only one bill in a Financial Year |
Second and subsequent incorrect bill in a financial year |
10% of excess amount billed |
11. |
Meter complaints |
|
|
|
(i) |
Replacement of defective meter |
Within fifteen days of declaring meter defective |
From 16th day of declaring meter defective |
Rs. 50 for each day of default |
12. |
Faults in Street light maintained by Licensee |
Rectification within seventy-two hours |
After lapse of 72 hours from the time consumer has made the complaint |
Rs. 75 for each day of default |
13. |
Voltage fluctuation |
|
|
|
(i) |
Local problem |
Resolution within four hours |
After lapse of 4 hours from the time consumer has made the complaint |
Rs. 50 for each day of default |
(ii) |
Tap setting of transformer |
Resolution within twenty four hours |
After lapse of 24 hours from the time consumer has made the complaint |
Rs. 25 for each day of default |
(iii) |
Repair of distribution line/transformer/capacitor |
Resolution within fifteen days |
After 15 days from the time consumer has made the complaint |
Rs. 100 for each day of default |
(iv) |
Installation and Up-gradation of HT/LT System |
Resolution within ninety days |
After 90 days from the time consumer has made the complaint |
|
14. Power
Supply Failure
(a)
Compensation for power supply failure,
standard for restoration and compensation payable for a consumer of sanctioned
load or contract demand upto 20kW:
Sl. No. |
Service Area |
Standard for restoration of power supply for the Zone/Sub-division
having AT&C losses |
Computation of period of default |
Compensation payable to the consumer for the period of default in case
of violation of standard |
||
Upto 10% |
More than 10% and Upto 20% |
More than 20% |
||||
(1) |
(2) |
(3) |
(4) |
(5) |
(6) |
(7) |
(i) |
Continuous power failure affecting individual consumer and group of
consumer upto 100 connected at Low voltage supply, excluding the failure
where distribution transformer requires replacement. |
Within three hours |
Within four hours |
Within six hours |
After lapse of period as specified in column (3), (4), (5) as the case
may be from the time 1st consumer has made the complaint. |
Rs. 10 per kW per hour of sanctioned load or contract demand, as the
case may be, subject to maximum of Rs. 200 per hour per consumer. |
(ii) |
Continuous power failure affecting more than 100 consumers connected at
Low voltage supply excluding the failure where distribution transformer
requires replacement. |
Within two hours |
Within three hours |
Within four hours |
After lapse of period as specified in column (3), (4), (5) as the case
may be from the time 1st consumer has made the complaint. |
Rs. 10 per kW per hour of sanctioned load or contract demand, as the
case may be, subject to maximum of Rs. 200 per hour per consumer. |
(iii) |
Continuous power supply failure requiring replacement of distribution
transformer. |
Within six hours |
After lapse of 6 hours from the time consumer has made the complaint. |
Rs. 10 per kW per hour of sanctioned load or contract demand, as the case
may be, subject to maximum of Rs. 200 per hour per consumer. |
||
(iv) |
Continuous power failure affecting consumers connected through High
Voltage Distribution System (HVDS) and not covered under (i) & (ii) above |
Within three hours |
After lapse of 3 hours from the time consumer has made the complaint. |
Rs. 10 per kW per hour of sanctioned load or contract demand, as the
case may be, subject to maximum of Rs. 200 per hour per consumer. |
||
(v) |
Continuous scheduled power outages |
Within 12 hours or restoration of power supply by 6PM |
From the lapse of 12 hours from the scheduled start of maintenance or
after 6PM of the day whichever is earlier. |
Rs. 10 per kW per hour of sanctioned load or contract demand, as the
case may be, subject to maximum of Rs. 200 per hour per consumer. |
||
(vi) |
Replacement of burnt meter or stolen meter |
Restoration of supply within three hours either by bypassing the burnt
meter or by installing temporary meter. |
After lapse of 3 hours from the time consumer has made the complaint |
Rs. 10 per kW per hour of sanctioned load or contract demand, as the
case may be, subject to maximum of Rs. 200 per hour per consumer. |
||
(vii) |
|
Meter to be replaced within three days |
After lapse of 3 days from the time consumer has made the complaint |
Rs. 50 for each day of default |
(b)
Any consumer having sanctioned load or
contract demand above 20kW, affected continuously by the power supply failure
as above, may approach the Commission for determination of the compensation.
(c)
The Licensee shall upload on its
website the AT&C losses for the zone/sub-division for the preceding
financial year by 15th of April of the year.
(d)
Any claim arising on account of power
failure shall not be admissible for those consumers who have outstanding dues
upto preceding billing cycle, or have been, during last two years, convicted
for theft of electricity or finally assessed for Unauthorised Use of
Electricity.
Note:
(i)
For the purpose of determination of
compensation to the consumer in case of violation of standard, the days beyond
the standard for period of default shall be taken as calendar days.
(ii)
Where the compensation payable has
been specified based on default in days and the default is part of the day, the
compensation shall be payable for the whole day.
The Commission may, at any time and on such
terms as it may think fit, amend, alter or modify any provision of these
Regulations or remove any error or defect in these Regulations. Any
amendment/alteration/modification Order in this regard except for rectification
of a typographical error will clearly indicate reasons for amendment in
writing.
Regulation - 88. Repeal and Savings:
(1)
Save
as otherwise provided in these Regulations, the following Regulations issued by
the Commission are hereby repealed:
(i)
Delhi
Electricity Supply Code & Performance Standards Regulations, 2007.
(ii)
Delhi
Electricity Regulatory Commission (Procedure for Filing Appeal before the
Appellate Authority) Regulations, 2005.
(2)
Notwithstanding
such repeal, anything done or action taken or purported to have been taken, or
proceedings initiated under such repealed Regulations, shall be deemed to have
been taken under these Regulations to the extent that same were not
inconsistent with the Act.
OVERALL STANDARDS OF PERFORMANCE
(1)
Power Supply Failure: The Licensee
shall maintain the percentage of Power Supply Failures rectified within the
time limits prescribed under Schedule-I to total calls received not less than
95%.
(2)
Scheduled outages: Interruption in
power supply due to scheduled outages, other than the load-shedding, has to be
notified in advance and shall not exceed twelve hours in a day and in each such
event, the Licensee has to ensure that the supply is restored by 6:00PM. The
Licensee shall achieve both of these standards of performance in at least 95%
of the cases.
(3)
Reliability Indices
(1)
The Licensee shall calculate the
reliability of its distribution system on the basis of number and duration of
sustained interruptions in a reporting period, using the following indices:
(i)
System Average Interruption Frequency
Index (SAIFI) which means the average frequency of sustained interruptions per
consumer occurring during the reporting period, determined by dividing number
of consumers who have experienced a sustained interruption by the total number
of consumers.
(ii)
System Average Interruption Duration
Index (SAIDI) which means the average duration of sustained interruptions per
consumer occurring during the reporting period, determined by dividing the sum
of all sustained consumer interruptions durations, in minutes, by the total
number of consumers; and
(iii)
Customer Average Interruption Duration
Index (CAIDI) which means the average interruption duration of sustained
interruptions for those consumers who experienced interruptions during the
reporting period, determined by dividing the sum of all sustained consumer
interruption durations, in minutes, by the total number of interrupted
consumers for the reporting period, or by using the equation: CAIDI =
SAIDI/SAIFI;
(2)
The Licensee while calculating the
above indices, shall not take into account the following types of
interruptions:
(i)
Scheduled outages;
(ii)
Momentary outages of a duration not
more than five minutes;
(iii)
Outages due to the failure of the
grid;
(iv)
Outages due to the reasons described
in Force Majeure conditions.
(3)
Method of computing Reliability
Indices
(i)
System Average Interruption Duration
Index (SAIDI) = It is average duration of sustained interruptions per consumer.
SAIDI=? ri x Ni/Nt
(ii)
System Average Interruption Frequency
Index (SAIFI) = It is average frequency of sustained interruptions per
consumer.
SAIFI =?Ni/Nt
Where;
i = an interruption event;
ri = restoration time for each interruption event;
Ni= number of consumers who have experienced a sustained
interruption during the reporting period; and
Nt = total number of consumers of Licensee
(iii)
Customer Average Interruption Duration
Index (CAIDI) = It is average interruption duration of sustained interruptions
for those consumers who had experienced interruptions. CAIDI = SAIDI/SAIFI.
(4)
The Licensee shall propose the target
level of these indices annually while submitting ARR. The Commission would
accordingly notify these indices.
(4)
Frequency variations: The Licensee
shall achieve coordination with other network constituents such as State
Transmission Utility, State Load Dispatch Center, distribution Licensees and
other transmission Licensees in an endeavor to maintain the supply frequency as
per the Indian Electricity Grid Code as amended from time to time.
(5)
Voltage Imbalance: The Licensee shall
ensure that the voltage Imbalance does not exceed 3% at the point of
commencement of supply. Voltage Imbalance shall be computed in a manner to be
notified by the Commission separately. The Licensee shall submit an exception
report to the Commission giving details of the instances when the voltage was
beyond the permissible limit at the distribution transformer level.
(6)
Billing mistakes: The Licensee shall
maintain the percentage of bills requiring modifications based on consumer
complaints to the total number of bills issued, not greater than 0.2%.
(7)
Electrical accidents:
The Licensee shall endeavour to avoid any electrical
accident. Increase or decrease in number of electrical accidents compared over
a period of time will also be an indicator of the Licensee's performance.
The Summary of Overall performance standards is as follows:
Service area |
Overall Standard of Performance |
Power Supply Failure |
At least 95% calls received should be rectified within prescribed time
limits |
Scheduled outage |
At least 95% of cases resolved within time limit |
Faults in Street Light maintained by Licensee |
At least 90% cases should be complied within prescribed time limits |
Reliability Indices |
|
SAIFI |
To be laid down by the Commission based on the targets proposed by the
Licensees. |
SAIDI |
|
CAIDI |
|
Frequency variations |
To maintain supply frequency within range as per IEGC. |
Voltage Imbalance |
Maximum of 3% at point of commencement of supply |
Percentage billing mistakes |
Shall not exceed 0.2% |
Formula for assessment of energy in
case of unauthorized use of electricity or theft of electricity
(1)
For the purpose of assessment,
connected load on the date of inspection, shall be computed as under:-
"Connected load" means aggregate of the
manufacture's rating of all energy consuming devices in the consumer's
premises, which can be simultaneously used. This shall not include the load of
spare plug, sockets, load exclusively installed for firefighting purposes. Only
heating or cooling apparatus shall be taken into account as per prevailing
season (1st April to 30th September for cooling use and 1st October to 31st
March for heating use).
(2)
Assessment of energy shall be done
based on the following formula:
Units assessed = L x D x H x F, where
(i)
L is the connected load (in kW or kVA
as per applicable tariff) on the date of inspection.
(ii)
D is number of days for assessment
period.
(iii)
H is use of supply hours per day,
which shall be taken for different categories of use as below:
a) |
Single shift industry (day/night only) |
10 hrs. |
b) |
Non-continuous process industry (day and night) |
20 hrs. |
c) |
Continuous process industry |
24 hrs. |
d) |
Non-domestic (general) including restaurants |
11 hrs. |
e) |
Hotels, hospitals, nursing homes, guest houses, petrol pumps |
20 hrs. |
f) |
Domestic |
8 hrs. |
g) |
Agriculture |
10 hrs. |
h) |
Temporary Connections |
12 hrs. |
i) |
Any other category not mentioned above |
13 hrs. |
(iv)
F is load factor, which shall be taken
for different categories of use as below:
a) |
industrial |
60% |
b) |
non-domestic |
60% |
c) |
domestic |
40% |
d) |
agriculture |
50% |
e) |
direct theft |
100% |
f) |
temporary connections |
100% |
i) |
Any other category not mentioned above |
60% |
(3)
The hours for the purpose of
assessment in the cases of bonafide domestic use shall not be considered more
than one hour per day on 100% load factor for domestic water pump, microwave
oven, washing machines and petty domestic appliances.