Himachal
Pradesh Town And Country Planning (Fifth Amendment) Rules, 2020
[20 August 2020]
No. TCP-A (3)-2/2019.-WHEREAS, the draft Himachal Pradesh
Town and Country Planning (Fifth Amendment) Rules, 2019 were published in the
Rajpatra (e-Gazette), Himachal Pradesh dated 07-11-2019, vide this Department
Notification of even number dated 05-11-2019 for inviting objection(s) and
suggestion(s) from the persons likely to be affected thereby, as required under
subsection (1) of section 87 of the Himachal Pradesh Town and Country Planning
Act, 1977 (Act No.12 of 1977);
AND WHEREAS, no objection(s) and suggestion(s) have been
received within the stipulated period by the State Government in this behalf .
NOW, THEREFORE, in exercise of the powers conferred by
section 87 of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No.
12 of 1977), the Governor, Himachal Pradesh is pleased to make the following
rules further to amend the Himachal Pradesh Town and Country Planning Rules,
2014, notified vide this Department Notification No. TCP-A (3)-I/2014-I dated
1-12-2014 and published in the Rajpatra, Himachal Pradesh on 1-12-2014,
namely:-
Rule - 1. Short title.
These rules may be called the Himachal Pradesh Town and
Country Planning (Fifth Amendment) Rules, 2020.
Rule - 2. Amendment of rule 13, 14 and 15.
In rule 13, 14 and 15 of the Himachal Pradesh Town and
Country Planning Rules, 2014 (hereinafter referred to as the said rules) for
the words and sign "apartments, colonies," the words "Real
Estate Projects" shall be substituted respectively.
Rule - 3. Amendment of rule 16.
In rule 16 of the said rules,-
(a)
for
sub-rule (1), the following sub-rule shall be substituted, namely:-
"(1) ?Any person, intending to carry out development
of any land under sub-section (2) of section 15-A or clause (a) of section 16
or sub-section (1) of section 30 or section 30-A (beyond the limits as
specified under section 30-A) of the Act may apply for such development in
Form-11 for sub-division of land and Form-12 for construction of building
alongwith the Specification and Schedule of area attached with the application
form or for development of Real Estate Project may apply for such development
in Form-34 either personally or by post i.e. off line or online"; and
(b)
In
sub-rule (2), for the words and figures "or section 78p of the Act",
the words "of the Act or the Real Estate Project" shall be
substituted.
Rule - 4. Insertion of rule 19-A.
After rule 19 of the said rules, the following new rule
shall be inserted, namely:-
"19-A. Grant of No Objection
Certificate or Completion Certificate.-
The No Objection Certificate for
releasing Service Connections or Completion Certificate in respect of the
Building shall be granted by the Director after satisfying himself about
completion of construction of building as per approved plan /revised sanction
to be carried out by the owner.
The No Objection Certificate for
releasing Service Connections or Completion Certificate shall be issued in
Form-13-A."
Rule - 5. Substitution of rule 41 to 69.
For rule 41 to 69 of the said rule the following shall be
substituted, namely:-
"41. Regulations for Real Estate Project.-
The Regulations for development of
Real Estate Projects shall be as specified in Appendix-7.
Rule - 6. Amendment of Form 12.
In form12, appended to the said rules, the words
"apartment,colony," shall be deleted.
Rule - 7. Insertion of Form 13-A.
After form 13 appended to the said rules, following new form
shall be inserted, namely :-
"TOWN AND COUNTRY PLANNING
DEPARTMENT HIMACHAL PRADESH
FORM-13-A
[See rule 19-A]
NO OBJECTION CERTIFICATE FOR
RELEASING SERVICE CONNECTIONS OR COMPLETION CERTIFICATE
No.......................Dated.......................
To
Shri/Smt./M/s.......................
..............................................
..............................................
Subject.-No Objection Certificate for Releasing Service
Connections or Completion Certificate.
Reference : Your Application No.......................dated
.......................
This is in reply to your application under reference for
issuance of No Objection Certificate for Releasing Service Connections or
Completion Certificate. This No Objection Certificate for Releasing Service
Connections or Completion Certificate is hereby granted in your favour for
....................... storey building for ....................... use on the
land bearing Khasra No....................... Hadbast No.......................
Mohal / Mauza ....................... Tehsil .......................
District....................... Himachal Pradesh, measuring as the development
works have been completed by you in all respects, as per approved plan/revised
sanction granted to you, vide letter No.......................
dated....................... as per the provisions of the Himachal Pradesh Town
and Country Planning Act, 1977 (Act No. 12 of 1977).
Further, this Department has no objection, if following
service connection(s) with reference to section-83-A of the Himachal Pradesh
Town and Country Planning Act, 1977 are released in your favour:- ?
|
Floor
|
Use
|
Number
of service Connections (In Words)
|
|
Electricity
|
Water
|
Sewerage
|
|
|
|
|
|
|
This No Objection Certificate for Releasing Service Connections or Completion
Certificate is issued subject to following condition(s):-
(i)
That
the said building is constructed as per the provisions of the Himachal Pradesh
Town and Country Planning Act, 1977, the Himachal Pradesh Town and Country
Planning Rules, 2014 and the Regulations contained in the respective Interim
Development Plan/ Development Plan of the concerned Planning Area/Special Area.
(ii)
This
No Objection Certificate for Releasing Service Connections or Completion
Certificate is subject to withdrawal, in case, if above named person carries
out any unauthorized construction or any addition/alteration in old building or
in case any documents produced by him/her are found fake.
(iii)
The
service connection(s) is/ are issued for the above referred buildings
constructed over the Khasra number as mentioned above. If the service
connections are installed in other building (s) or other Khasra numbers, the
same shall stand withdrawn.
Note.-Strike out which is not applicable
Sd/-
Director,
Town and Country Planning Department,
Himachal Pradesh, Shimla.
Copy to:-
1.
The
Executive Engineer, Division No. ................... Himachal Pradesh State
Electricity Board Ltd................... for information and further necessary
action.
2.
The
Executive Engineer, Division No................... Himachal Pradesh Irrigation
and Public Health Department ................... for information and further necessary
action.
Sd/-
Director,
Town and Country Planning
Department,
Himachal Pradesh, Shimla.
Rule - 8. Amendment of Form 26.
In form 26 of the Himachal Pradesh Town and Country Planning
Rules, 2014, for clause (IX), the following clause shall be substituted,
namely:-
"(ix) For the plots abutting
National Highways.-The access permission to properties along National Highways
provided in Guidelines for access permission to Fuel Station and Properties
along National Highways-amendments vide letter No. RW-NH-33032/01/2017, dated
19th July, 2018 shall be mandatory. For other State Highways, and Himachal
Pradesh Public Works Departments scheduled roads the applicant shall be
required to submit a selfdeclaration/undertaking to maintain minimum control
width/ setback as per provisions of the Himachal Pradesh Road Side Land Control
Act, 1968."
Rule - 9. Substitution of Forms 34 to 60.
For forms 34 to 60 appended to the said rules, the following
form shall be substituted, namely:-
" TOWN AND COUNTRY PLANNING
DEPARTMENT HIMACHAL PRADESH
FORM -34
(See rules 13, 14 and 16)
APPLICATION FOR GRANT OF PLANNING
PERMISSION FOR REAL ESTATE PROJECT
To
.....................................
.....................................
.....................................
Sir,
I/we hereby wish to apply for the grant of planning
permission to set up a Real Estate Project having name and style of
project................... in Khata No................... Khatauni
No................... Hadbast
No......................................Mauja/Mohal No...................
Khasra No ...................measuring................... square Metres,
Tehsil................... District................... Himachal Pradesh.
1.
The
requisite particulars are as under:-
(i)
Status
of the Applicant, whether individual or Company or Firm or Association of
Persons or Co-operative Society or joint family ...................
(ii)
In
case of Individual or Association of Persons or joint family:-
(a)
Name............................................................................
(b)
Fathers
Name............................................................................
(c)
Occupation
............................................................................
(d)
Permanent
Address .........................................................
(iii)
In
case of Firm or Co-operative Society or Company:-
(a)
Name......................................
(b)
Address
......................................
(c)
Copy
of Registration Certificate ......................................
(d)
Major
activities ......................................
(e)
Name
and Address of Partners/ Chief Executive/Full time
Directors......................................
(i)
Whether
applicant is Income Tax payee/ assesses, if so, give Permanent Account Number
(PAN) No......................................alongwith Aadhar
No......................................
(ii)
Whether
the applicant had ever been granted permission to set up a Real Estate Project
or Building or Apartment under any other law, if yes, details
thereof......................................
(iii)
Whether
the applicant has ever established a Real Estate Project or is establishing a
Real Estate Project, if, yes details
thereof......................................
2.
The
following Plans, Drawings and other documents are submitted online, namely:-
(i)
a
copy of latest Jamabandi (not being more than six month old), in original
showing the title/ownership of the land under the Real Estate Project;
(ii)
a
copy of latest original Tatima(not being more than six month old), showing
Khasra number(s), description and area of land in question, abutting path with
its width as well as adjoining Khasra numbers falling on all the outer limits/
boundaries of the land in question. The land applied for shall be shown in red,
in the Tatima;
(iii)
details
of encumbrances on the land on which development of project is proposed
including details of any rights, title, interest, dues, mortgage, litigation in
Revenue Courts and name of party in or over such land or non-encumbrance
certificate from an Advocate having experience of atleast ten years or from the
revenue authority not below the rank of Tehsildar/ Naib Tehsildar, as the case
may be;
(iv)
three
sets of Location Plan in the scale of 1:1000 showing North direction,
indicating the land in question, showing main approach road(s), name of road(s)
on which the property and boundaries abuts, important public buildings like
hospital, school, cinema, petrol pump, existing land uses / building uses
surrounding the land;
(v)
three
sets of Site Plan in the scale of 1:200 showing North direction and all the
boundaries of land in question, abutting path with its width, natural features
like nullahs, ponds, trees, slopes, contours at an interval of 5.00 Metre, if
the land is undulated, high tension lines passing through or adjoining the
land, existing roads, highways showing the right of way, railway lines,
airports with their specification(s) and boundaries, showing details of
utilities and services like water supply, drainage, sullage, sewage, sewerage
alongwith disposal of drainage, sullage, sewage, position of septic tank, soak
pit, sewerage treatment plant, rain harvesting tank, electric and telephone poles,
showing manner and site for muck disposal, firefighting, emergency evacuation
services, use of renewable energy, and all such other matters which need to be
co-ordinated with the adjoining area;
(vi)
for
plotted projects i.e. sub-division of land into plots, three sets of drawings
in the scale of 1:100 showing North direction, dimensions and area of plots,
internal roads, setbacks, parks and open spaces, community buildings such as
school, dispensary, post office, bank etc. and all development proposals including
a general report and mode, so as to make the scheme self-explanatory;
(vii)
for
flatted Projects i.e. construction of building, apartment etc., three sets of
drawings in the scale of 1:100 showing North direction, dimensions and area of
building, apartment/flats etc. and other architectural details and
specifications of proposed building, apartment/flat and all development
proposals including general report etc. alongwith Schedule of built up area and
open area, setbacks, area calculation sheet of each plot or apartment/flat and
any other information or document or Plan or Design, as may be required by the
Director;
(viii)
an
explanatory note explaining the salient features of the proposed Real Estate
Project in particular, the source of whole some water supply arrangements and
site for disposal and treatment of storm and sullage water. Detailed
specifications and designs of water supply schemes, storm water, sullage,
sewage and sewerage with estimated costs of each component with cost analysis
thereof;
(ix)
three
sets of drawings showing the cross-sections of the proposed roads indicating,
in particular the width of the proposed drainage ways, cycle tracks and
footpaths, green verges, position of electric poles, telephone poles and of any
of other works connected with such roads. These drawings shall indicate the
position of sewers, storm water channel, water supply and any other public
health services. The detailed specifications and designs of roads, works
thereof;
(x)
one
set of detailed specifications and structural design of buildings or
apartments/flats with the detailed component-wise estimated cost of buildings
or apartments/flats and an undertaking regarding the Structural Stability
Certificate and Soil Investigation Report thereof in Form 15;
(xi)
a
set of detailed specification and design for electric supply including street
lighting, etc ;
(xii)
an
undertaking in the shape of self-declaration/undertaking to the effect that
while constructing the building or apartment/flat, the promoter shall abide by
and conform to the Himachal Pradesh Public Works Departments specification(s)
for the quality of material to be used and quality of constructions;
(xiii)
a
note indicating the type of development proposed i.e. land Use or building use,
namely residential or commercial or industrial or public and semi-public use
etc; and
(xiv) the name and address of the
registered Town Planner/ Architect/ Engineer.
3.
I/We
further hereby enclose the following documents, namely:-
(i)
Check
List as per Appendix 7.
(ii)
Receipt
in the shape of e-Challan or Challan or e -payment or Demand Draft drawn in
favour of the Competent Authority amounting to Rs...............only
(Rs...............only) as application fee.
4.
It
is further requested that I /we may be exempted from providing the following
amenity or amenities in the proposed Real Estate Project and an explanatory
note, in duplicate, alongwith plans marked A.B.C. (so on) as to why the said
amenity or amenities are not required to be provided in the Real Estate Project
are enclosed herewith:-
(i) .................................................
(ii)
.................................................
(iii)
.................................................
5.
I/We
solemnly affirm and declare that the particulars given in para 1 to 4 above are
correct to the best of my/our knowledge and belief.
Enclosures: As above. Yours
faithfully,
Dated:.......................
Signature of Applicant(s)
Place:.......................
alongwith full Name(s)
Phone No.......................
E-mail
address.......................
Rule - 10. Amendment of Appendix -1.
In Appendix-1 appended to the said rules, in General
Regulation III, for clause 10 and 14, the following clauses shall be
substituted, namely:-
"10. For the plots abutting
National Highways.-The access permission to properties along National Highways
provided in Guidelines for access permission to Fuel Station and Properties
along National Highways-issued vide letter No. RW-NH-33032/01/2017 dated 19th
July, 2018 shall be mandatory. For other State Highways, and Himachal Pradesh
Public Works Departments scheduled roads the applicant shall be required to
submit a selfdeclaration/undertaking to maintain minimum control width/ setback
as per provisions of the Himachal Pradesh Road Side Land Control Act, 1968.
14. ??Adequate distance from all the electric lines
including HT/LT lines as per the requirement of Himachal Pradesh State
Electricity Board Limited (HPSEB Ltd.) Rules shall have to be maintained. A
Self Declaration/Certificate to this effect shall be submitted by the applicant
in this regard."
Rule - 11. Insertion of Appendix-1.
In Appendix-1 appended to the said rules, in General
Regulation III after clause 30, the following new clause shall be inserted,
namely:-
" 31. The onus of obtaining all
the necessary approvals/clearances required from all the concerned Departments
in respect of Self-Declaration/Certificate given by the applicant before
starting actual execution of the work shall be on the applicant. The Department
of Town & Country Planning shall not be liable for any violations done by
the applicant in respect of other applicable acts, rules and any legal
dispute."
Rule - 12. Substitution of Appendix-2.
For Appendix-2, appended to the said rules, the following
shall be substituted, namely:-
" APPENDIX-2
(See rules 13 and 14)
REGULATIONS FOR INDUSTRIAL USE
For Industrial use/activities, following Regulations shall
be applicable:-
1.
Minimum
area of plot:-
(a)
For
small scale industry shall be 150 M2 to 500 M2.
(b)
For
services/light scale industry shall be above 500 M2 to 1000 M2.
(c)
For
medium scale industry shall be above 1000 M2 to 5000 M2.
(d)
For
large and heavy scale industry shall be above 5000 M2 to 10000 M2 and above
10000 M2.
(e)
The
plot area as mentioned in clauses (a) to (d) above would not be applicable in
the cases where the sub-division of land has taken effect before the
commencement of the Himachal Pradesh Town and Country Planning Rules, 2014.
(f)
The
plot area as mentioned under clauses (a) to (d) above would not be applicable
for the individual plots, if any, created/allotted by the Himachal Pradesh
Industries Department or the Himachal Pradesh State Industrial Development
Corporation (HPSIDC) or the Himachal Pradesh Housing and Urban Development
Authority (HIMUDA) or any Local Authority or any Authority constituted under
the Himachal Pradesh Town and Country Planning Act,1977 (Act No. 12 of 1977) or
any other Authority prior to coming into force of the Himachal Pradesh Town and
Country Planning Rules, 2014.
(g)
The
layout and design of industrial area, if any, shall be as per requirement of
the Industry and shall be got approved from the Director.
2.
Height
of floor/storey:-
3.
The
minimum floor/ storey height of industrial building shall be 3.00 M and sloping
roof height shall be in accordance with volume of the structure. In case of
roof trusses, height of building should be adjusted /relaxed accordingly.
4.
Type
of Industry, minimum Plot Area, minimum Set Backs, maximum Floor Area Ratio
(FAR) and maximum height of building:-
5.
The
minimum plot area, minimum set backs, maximum Floor Area Ratio (FAR) and
maximum height of building for different type of Industry shall be governed by
the following Table: -
|
Sr.No.
|
Type
of Industry
|
Plot
area in M2
|
Minimum
Set Back in Metres
|
Max.
FAR
|
Max.
Height
|
|
Front
|
Left
|
Right
|
Rear
|
| |
1
2
|
3
|
4
|
5
|
6
|
7
|
8
|
9
|
|
1.
|
Small
Scale Industries
|
150
to 500
|
3.00
|
2.00
|
2.00
|
2.00
|
2.00
|
There
shall be no upper limit for height of structure of Industrial use, which
shall be flexible as per the requirement of Industrial Enterprise. However
the total floor area should be within the prescribed FAR
|
|
2.
|
Services/
Light scale Industries
|
Above
500 to 1000
|
5.00
|
2.00
|
2.00
|
3.00
|
2.00
|
| |
3.
Medium
Scale Industries
|
Above
1000 to 5000
|
10.00
|
5.00
|
5.00
|
5.00
|
1.50
|
| |
4.
Large
and Heavy Scale Industries
|
Above
5000 to 10000
|
15.00
|
7.50
|
7.50
|
7.50
|
1.25
|
| |
|
Above
10000
|
15.00
|
7.50
|
7.50
|
7.50
|
1.00
|
Note:-
(i)
Right of Way should not be
less than 5.0 Mts. for plot having area upto 1,000 Sq. Mts. and in case of
plots having area more than 1000 Sq. Mts., the Right of Way should not be less
than 10.0 Mts.
(ii)
Service area required for
pharmaceutical units or such type of Industries under requirement of Goods
Manufacturing Practice (G.M.P) shall not be included for calculation of FAR,
provided it is only used for utilities and services but not in any case for
production.
(iii)
The Security Room/Drivers
Rest Room upto floor area of 25 M2 would not be counted in permissible FAR.
(iv)
Parking Floor upto 15 feet
height (4.50 Mts.) shall be allowed and such parking floor would not be counted
in permissible FAR. However, the subsequent parking floors shall be counted
within FAR.
(v)
10% of the area at parking
floor shall be allowed for drivers room and toilets etc.
(vi)
In case of plots having area
of 5,001 Sq. Mts. and above regulations of minimum setbacks would be of
mandatory. In other category of plots regulation of minimum front set back
would be mandatory and rest of the setbacks shall be relaxable as per
functional requirements of the industrial enterprise(s). This relaxability in
set backs is subject to condition that the overall area under setbacks should
be minimal area which was to be kept under the setbacks in case relaxability
was not provided.
(vii)
Micro, Small and Medium
Enterprises after obtaining the title of land and applying for development
permission may start physical implementation of project without waiting for
statutory approvals under the Himachal Pradesh Town and Country Planning Act,
1977 in accordance with the provisions of self-certification as stated in para
7 (ii)(xii) of the "Himachal Pradesh Industrial Investment
Policy-2019.".
6.
Construction
of Cellar:-
(a)
Construction of Basement /
Cellar exclusively for industries set up on plot size exceeding 1,000 Sq. Mts
for captive use shall be allowed and same shall not be counted as a storey or
in permissible FAR and should be constructed within the prescribed setbacks and
prescribed building lines and subject to maximum coverage on floor i.e.
entrance floor and may be put for following uses:-
(i)
storage of household or
other goods of ordinarily combustible material;
(ii)
strong rooms, bank cellars
etc;
(iii)
air conditioning equipment
and other machines used for services and utilities of the building; and
(iv)
parking spaces.
(b)
The cellar shall have
following requirements:-
(i)
all the walls shall be kept
dead and below the natural ground level except the portion kept for ventilation
purpose;
(ii)
every cellar shall be, in
every part, at least 2.40 M in height from the floor to the underside of the
roof slab or ceiling;
(iii)
adequate ventilation shall
be provided for the cellar and any deficiency in ventilation requirements may
be met by providing mechanical ventilation in the form of blowers, exhaust fans
and air conditioning system etc;
(iv)
the minimum height of the
ceiling of any cellar shall be 0.90 M and the maximum 1.20 M above the average
surrounding ground level;
(v)
adequate arrangements shall
be made such that surface drainage does not enter the cellar;
(vi)
the walls and floors of the
cellar shall be watertight and be so designed that the effects of the
surrounding soil and moisture if any, are taken into account in design and
adequate damp proofing treatment is given;
(vii)
the access to the cellar
shall be separate from the main and alternative staircase providing access and
exit from higher floor. Where the staircase is continuous in the case of
buildings served by more than one staircase, the same shall be enclosed type,
serving as a fire separation from the cellar floor and higher floors. Open
ramps shall be permitted, if they are constructed within the building line
subject to the provision of clause (v) above;
(viii)
in case partition in the
cellars is allowed by the Authority, no compartment shall be less than 50.00 M2
in area and each compartment shall have proper ventilation provision and the
cellar partition shall however, conform to the norms laid down by the Fire
Services; and
(ix)
in no circumstances,
construction of Toilet, Bath, Kitchen etc. shall be allowed in the
cellar."
Rule - 13. Amendment of Appendix -3.
In Appendix-3
appended to the said rules,-
(a)
in Regulation 11, for clause
(i), the following clause shall be substituted, namely:-
"
(i) ?In case of buildings above 15.00 M
height, No Objection Certificate from the Director of Fire Services or Chief
Fire Officer, as the case may be, shall be required only at the completion
stage.";
(b)
in Regulation 12, for clause
(i), the following clause shall be substituted, namely:-
"(i)
??Water Availability Certificate from the
Himachal Pradesh Irrigation and Public Health Department regarding availability
of adequate water supply and viability of design of rain water harvesting
structure shall have to be furnished;
(c)
for Regulation 17, the
following regulation shall be substituted, namely:-
"17.
Distance from Electric Lines.-Adequate distance from the electric lines as per
the requirement of Himachal Pradesh State Electricity Board Limited (HPSEB
Ltd.) Rules shall have to be maintained."
(d)
for Regulation 18, the
following regulation shall be substituted, namely:-
"18.
Assessment of Power requirement.-In case power requirement assessment exceeds
50 KW, proper space for installation of electric Transformer and Transmission
Lines of 11 KV shall be provided in the layout plan. The proposed space is to
be got verified from the concerned Officer of the HPSEB Ltd. and accordingly
report shall have to be furnished."
Rule - 14. Amendment of Appendix -8.
In Appendix-8 appended
to the said rules,-
(a)
in Regulation 5, for clause
(viii), the following clause shall be substituted, namely:-
"(viii)
Adequate distance from all the electric lines including HT/LT lines as per the
requirement of Himachal Pradesh State Electricity Board Limited (HPSEB Ltd.)
Rules shall have to be maintained. A Self Declaration/Certificate to this
effect shall be submitted by the applicant in this regard.
(b)
in Regulation 6, for clause
(ii), the following clause shall be substituted, namely:-
"(ii)
??Any person intending to carry out
development activities exempted under section 30-A of the Himachal Pradesh Town
and Country Planning Act, 1977 (Act No. 12 of 1977) shall give information on
simple paper alongwith a copy of original jamabandi and original tatima to the
concerned Panchayat before carrying out development activities. The concerned
Panchayat after verifying the documents, shall grant No Objection Certificate
for releasing Service Connections or Completion Certificate to the applicant
under Section 83-A of the Himachal Pradesh Town and Country Planning Act, 1977
(Act No. 12 of 1977) for obtaining service connections."